Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TD-DIV-1223-00132
Parcel: 11107028F

Address:
2468 N EDITH BL

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-1223-00132
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Building APPROVED
Commercial Plumbing APPROVED
External Reviewers - COT Parks & Recreation APPROVED Approved TPRD
TD-DIV-1223-00132
2468 N EDITH BL TUCSON, AZ 85716
Regarding TD-DIV-1223-00132, City of Tucson Parks and Recreation has no additional requirements for the Development Plan.

Thanks,
Joe Barr
Project Manager
Tucson Parks and Recreation Department
External Reviewers - Pima County Addressing APPROVED Good morning,
Pima County Addressing approves 2 LOT MINOR SUBDIVISION / TD-DIV-1223-00132.
Thank you
Nicholas Jordan
Site Review Project Manager – Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
External Reviewers - Pima County Assessor APPROVED Office of the Pima County Assessor
240 N STONE AVENUE
Tucson, Arizona 85701
SUZANNE DROUBIE
ASSESSOR
TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)
FROM: Julieann Arechederra
GIS Cartographer
Pima County Assessor’s Office
DATE: January 11, 2024
RE: Assessor’s Review and Comments Regarding:
2468 N EDITH BL, LOTS 1-2 TD-DIV-1223-00132
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.
COMMENTS:
NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
New Services/JOC APPROVED TD-DIV-1223-00132 - Land Division_Subdivison v1 – 2468 N EDITH BL

1. Tucson Water has no objections to the proposed minor subdivision or any comments regarding the submitted final plat.

2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
NPPO APPROVED
Residential Building APPROVED
Site Engineering APPROVED
CDRC Post Review Express PENDING ASSIGNMENT
External Reviewers - Pima County Wastewater (RWRD) REQUIRES RESUBMIT The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit.
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 2468 N. Edith Bl, Lots 1-2
FINAL PLAT (1st Review)
TD-DIV-1223-00132

TRANSMITTAL DATE: December 27, 2023

DUE DATE: January 20, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.

2-07.5.0 CONTENT REQUIREMENTS

2-07.5.1 General

1. COMMENT: 2-07.5.1.H - The subdivision case number, TD-DIV-1223-00132, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

2-07.5.4 Proposed Subdivision Information

Provide the following information on the plat:

2. COMMENT: 2-07.5.4.H – Clarify the purpose for the “1’ NO ACCESS ESMT BY THIS PLAT” shown on the plat.

Additional Comments:

3. COMMENT: – Provide a supplemental residential plot plan that meets the requirements found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example. Based on aerial photos there have been several additions to the site that do not appear to have been permitted. These additions will need to be addressed prior to approval of this plat.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter.
If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED
CDRC Review Coordinator Express REVIEW COMPLETED Per SOP Addressing, Parks&Rec and RWRD review required. Review request email sent per TEP, Parks&Rec, Assessors. CDRC sent FYI email to PAG, USPS, SWG.
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time.
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Greetings, Tucson Electric Power Co. (TEP) has reviewed the plans submitted on December 20th, 2023, and has no objections. The customer is responsible for compliance with City Ordinances. Please note a jurisdictional permit for any work on a public road right of way where applicable. Easements are required for TEP facilities if not appropriately recorded on the final plat. They will need to be obtained by a separate instrument. Respectfully, Tucson Electric Power Co. Land Resources Department
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time.
Fire New Construction REVIEW COMPLETED
OK to Submit - Engineering Fast REVIEW COMPLETED
OK to Submit - Zoning Fast REVIEW COMPLETED
ROW Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov