Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TD-DIV-1123-00128
Parcel: 12607068B

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.4

Plan Number - TD-DIV-1123-00128
Review Name: LAND DIVISION/SUBDIVISION v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
CDRC Application Completeness APPROVED
External Reviewers - COT Parks & Recreation APPROVED Approved
TD-DIV-1123-00128
Address: (3938 E ELMWOOD ST TUCSON, AZ 85711)
City of Tucson Parks and Recreation has no additional requirements for the Development Plan.
Regards,
Joe Barr
Project Manager
Tucson Parks and Recreation
Residential Building APPROVED
CDRC Post Review PENDING ASSIGNMENT
Commercial Plumbing REQUIRES RESUBMIT Approval of the site plumbing workflow depends upon the approval of the “new neighborhood utilities – design by others” project noted in the overall site plan. Approval letters from Tucson Water for the water main extension and from PDSD for the private sewer collection system are required.
External Reviewers - Pima County Assessor REQUIRES RESUBMIT Office of the Pima County Assessor
240 N. Stone Ave.
Tucson, Arizona 85701
SUZANNE DROUBIE
PIMA COUNTY ASSESSOR
TO: City of Tucson Development Services
FROM: Karl Christensen
GIS Analyst
Pima County Assessor’s Office
Karl.Christensen@pima.gov
(520)724-3125
DATE: March 12, 2024
RE: Assessor’s Review and Comments Regarding: (SUBMITTAL 4)
TD-DIV-1123-00128 – ELMWOOD MINOR SUBDIVISION - FINAL PLAT
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Plat meets Assessor’s Office requirements.
__X___ Plat does not meet Assessor’s Office requirements.
COMMENTS:
See below for the generalized requirements the Assessor’s Office reviews for,
with specific requirements applicable to this specific plat review underlined:
• The Title Block must be in the lower right-hand corner and it must have
the number of lots or units or block or elements or any combination of
these. It must have the common areas listed if there are any. It must
have the section, township, and range and if it is a resubdivision, it
must mention the plat name and the Map & Plat/Sequence #.
• The location map must be in the upper right-hand corner and must have
the Section, Township, and Range. The project area should be outlined
and/or have an arrow pointing to it.
• General notes must have the gross area of the Subdivision, the number of
lots, the number of miles of new road, public or private (even if the
number is 0), and the Basis of Bearings.
• There must be a section tie, with a bearing and dimension from the
section corner or quarter corner to the point of tie on the subdivision.
(*Note: presumably some of the linework already in this plat are ties to
section corners, but those corners are not labeled, making the ties
useless.)
• The perimeter line must be solid and the heaviest lineweight on the
plat. The lot lines and common area lines must be solid and the next
heaviest. Lines for erosion setbacks, floodplain lines, etc. should be
the lightest lineweight and be dashed or dot-dashed.
(*Note: although the Record Of Survey this plat is clearly based off of
includes information for parcels/Lots adjacent to the Subdivision being
defined by this plat, a Subdivision plat does not necessarily need this
information. However, if it is to be shown in this plat it needs to be
clear that it is merely referential information and not a part of the
Subdivision itself as defined by this plat. Both labeling and
lineweights/linetypes should be employed to make this clear to any user
of this plat.)
• There must be bearings and dimensions for the perimeter and all lot
lines and all common areas.
• All lots must be numbered and have square footage. If the area is too
small, there can be a table to the side for the square footage.
(*Note: As this is a Subdivision plat, the parcels being defined by this
plat are technically Lots, thus they must be labeled as: Lot 1/2/3/etc.)
• All hatching, stippling, striping, etc. must be removed in the final
plat, unless another agency requires it. If so, all lettering must have
the hatching, etc. cut away so they are legible.
• All streets must be named in the final plat, and have dimensions,
bearings, and curve data.
• All adjacent subdivisions should be named, with map and plat in the
appropriate areas around the subdivision.
• Ownership printed in the Dedication section must match Assessor data.
(*Note: For APN 126-07-068B ownership is currently known to the
Assessor’s Office as being held by: HSL PROPERTIES FINANCIAL CORP INC)
NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. AUTOCAD DWGS CAN BE SENT TO THE
EMAIL ABOVE. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
External Reviewers - Pima County Wastewater (RWRD) REQUIRES RESUBMIT The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit.
New Services/JOC REQUIRES RESUBMIT TD-DIV-1123-00128 - Land Division_Subdivison v4 – 3938 E ELMWOOD ST

1. The lot layout is such that an extension of Tucson Water existing public water distribution system is necessary to comply with Tucson Water’s Water’s Remote Meter Policy No. IV-B.08, Eff. 07/14/2009. But, as of the date of these comments neither Tucson Water’s New Area Development Section nor Tucson Water’s New Services Section has received any form of plan needed to construct this extension of Tucson Water’s public water distribution system.

2. The proposed water main connecting to the existing 6” water main in Elmwood Street and serving the three lots must be a 4” public water main.

3. To comply with ADEQ’s Drinking Water regulations and Tucson Water’s Standard Detail 106, this new 4” public water main must be located at least 6’ away from the proposed 4” sewer collection line, as measured from outside of pipe to outside of pipe.

4. This new 4” public water main must also be located at least 5’ away from the other under main electrical feeder line (or other dry underground utility, such as natural gas, telephone or CATV) that will serve the three lots, as measured from outside of pipe to outside of conduit, unless the use of a Joint Use Trench per Tucson Water’s Standard Detail SD-108 is approved by Tucson Water.

5. This new 4” public water main may be located no closer than 7.5’ feet within the edge of a public utility easement.

6. The water meters and the electrical transformers and pedestals will need to be located within a public utility easement.

7. The proposed Ingress, Egress and Utility Easement shown on the final plat will need to be an Ingress, Egress and Public &Private Utility Easement, granted to all lot owners, the City of Tucson, and all utility companies by the final plat.

8. The Ingress, Egress, Public & Private Utility Easement must be shown using thin, dashed line on the final plat.

9. The width of the Ingress, Egress, Public & Private Utility Easement may need to be enlarged to 24’ wide to meet these requirements.

10. A resubmittal of the Overall Site Plan showing how these requirements will be met and the final plat is required. Tucson Water cannot approve this final plat until such time that it knows these requirements can and will be met.

11. This project is an excellent candidate for the installation of the new 4” public water main and the necessary water service lines and water meters, to be done under one of Tucson Water’s Job Order Contracts. Please contact Tucson Water’s New Services Section by sending an e-mail to TW_Common@tucsonaz.gov to discuss this option. This option is very likely to save the Applicant time and money.

12. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Site Engineering REQUIRES RESUBMIT 1. The current County Recorder is Gabriella Cazares-Kelly, please correct the approvals section.


Lianne Evans
lianne.evans@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Nathan Herrera
Planner

PROJECT:
Final Plat (1st Review)
TD-DIV-0224-00013

TRANSMITTAL DATE: March 25, 2024

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07.

2-07.4.0 FORMAT REQUIREMENTS
Plats must:
4.3 Have a two-inch margin on the left side and one-half inch margins on the remaining sides to comply with standardization requirements of state law for recorded plats.
COMMENT: Ensure the above standard is met on the next submittal.
4.4 Be drawn to a scale of no more than one-inch equals 40 feet.
COMMENT: Provide a scale on the site plan sheet.
2-07.5.0 CONTENT REQUIREMENTS
5.1 General
A. A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:
1. The project site approximately centered within a one square mile area.
COMMENT: Center the site within the Location Map per the above standard.
E. Provide a title block in the lower right corner of each sheet with the following information:
1. Subdivision name; number of blocks, lots, and/or units; and common area.
COMMENT: Provide the number of lots proposed in the Title Block per the above standard.
5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.
A. Certification of Survey
The following statement must be signed by a registered land surveyor and placed on the first page:
COMMNET: The Certification section on the Cover Sheet has a typo. Should read Certification of Plat, not Flat.

B. Approval and Recording Data Blocks
The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows.

COMMENT: The Pima County Recorder is Gabriel Cazares-Kelly. Provide the correct Recorder’s name in the Approval section.

5.4 Proposed Subdivision Information
Provide the following information on the plat:
A. Identify each block or lot within the subdivision boundary by number, and include the square footage of each.

COMMENT: The lots shown on the Plat should be assigned numbers (i.e. Lots 1,2,3). The Title Block will have to updated to show the amount of Lots proposed (Lots 1-3).

COMMENT: Per UDC Article 7.8.4.C, an access easement can only provide access across two parcels for single family development. A General Note needs to be added to the Plat stating that the proposed lots are restricted to single family development. Depending on how the access is going to be handled going forward (if a private road will be proposed instead of an easement) a Tentative Plat/Development Package will be required.


If you have any questions about this transmittal, please contact me at Nathan.Herrera@tucsonaz.gov or at 520-837-4894.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised Plat submittal along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
CDRC Review Coordinator REVIEW COMPLETED Addressing review not required per SOP. Review request email sent per Assessors, Parks&Rec & TEP. CDRC sent FYI email to PAG, USPS, SWG. RWRD required
Commercial Building REVIEW COMPLETED Not Commercial, please Residential Building comment,.
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Greetings, Tucson Electric Power Co. (TEP) has reviewed and has no objection to the plat submitted on February 16, 2024. There are existing TEP facilities within the boundaries of the plat. Costs for removing or relocating existing TEP facilities will be billable to the developer. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans, to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument. Respectfully, Tucson Electric Power Co. Land Resources Department
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
Fire New Construction REVIEW COMPLETED
NPPO REVIEW COMPLETED
OK to Submit - Engineering REVIEW COMPLETED
ROW Engineering Review REVIEW COMPLETED New construction in the public Right-of-Way shall be in conformance with the current edition of Pima Association of Governments (PAG) Standard Specifications and Details for public improvements. Visit https://apps.pagregion.com/standardspecifications/ for PAG standards and specifications.
Sidewalk PAG 200
Driveway PAG 206
Access Ramps PAG 207
Curbs PAG 209