Plan Number: TD-DIV-1025-00095
Parcel: 118060430

Review Status: Requires Resubmit

Review Details: LAND DIVISION/LOT SPLIT v.1

Plan Number - TD-DIV-1025-00095
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Record Documents Express PENDING ASSIGNMENT
Commercial Plumbing Fast REQUIRES RESUBMIT 1. For the purposes of having a water meter, a parcel is required to have a minimum width of 15-feet of frontage on a water main. An easement is not considered to be frontage. Reference: Tucson Water Remote Meter Policy, Number IV-B.08, dated 07/14/2009.
2. Each occupiable building that abuts a public street that includes a public sewer shall have an independent connection to the public sewer. Show how access to the public sewer will be provided for parcel A. Reference: Section 701.3, IPC 2018.
Residential Engineering Fast REQUIRES RESUBMIT Permit: TD-DIV-1025-00095
Location: 2226 S SAN JOSE DR
Review Date: 11/3/2025
Site Engineering Comments:
1. The proposed land split exceeds the number of allowed splits for a property whose boundaries are fixed by a recorded plat which is divided into two or more parts, see UDC Article 11.4.20 definition of a Subdivision. The streets the boundary of the subdivision are also not fully developed/improved (UDC 8.4.3.B.4) as well as the subdivision being designated and subject to Hillside Development standards (UDC 8.4.3.B.8) Therefore this is not able to be processed as a minor subdivision.
2. This will be required to follow the tentative and final plat process UDC 8.4.4 & 8.4.5 Due to the referenced criteria above.

If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
Residential Zoning Fast REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: TD-DIV-1025-00095
2226 S SAN JOSE DR. – R-1
Land Split (1st Review)

TRANSMITTAL DATE: November 3, 2025

DUE DATE: October 31, 2025

SECTION 2-08.0.0: LAND SPLIT

2-08.2.0 CONTENT REQUIREMENTS

1. COMMENT: 2-08.2.0 – Based on the existing legal description of this parcel “HIRAM BANKS ACRES S75' E150.7' LOT 14 & S150' W200' LOT 14” the original parcel was created via a platting process. The proposed land split exceeds the number of allowed splits for a property whose boundaries are fixed by a recorded plat which is divided into two or more parts, see UDC Article 11.4.20 definition of a Subdivision, C. A minor subdivision meeting AM 2-07 is required to be submitted and approved.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
TW New Development Review Fast REQUIRES RESUBMIT Per Tucson Water Remote Meter Policy No. IV-B.08 (07/14/2009), each parcel must have ≥15 ft of frontage on a public water main to qualify for a water meter; easements do not constitute frontage. Under the proposed lot split, Parcel A has sufficient frontage and can be served from the existing 8" CA water main, PN-045-1963. The other three parcels lack the required 15 ft frontage on a main; therefore water service/meters cannot be approved as configured.
CDRC Application Completeness Express REVIEW COMPLETED
Commercial Building Fast REVIEW COMPLETED
Residential Building Fast REVIEW COMPLETED