Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-0923-00105
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Plumbing APPROVED
External Reviewers - Pima County Addressing APPROVED Good evening,
Pima County Addressing approves TD-DIV-0923-00105.
Thank you
Nicholas Jordan
Site Review Project Manager – Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623

Pima County Development Services’ enhanced online permitting website is now live. Create an account to submit most applications online, and get your comments and documents directly from our portal. No more waiting for staff to email you!
Start here at (https://permits.pima.gov).
The Pima County Development Services Team – Your gateway to Building Safety
NPPO APPROVED
Residential Building APPROVED
ROW Engineering Review APPROVED
CDRC Post Review PENDING ASSIGNMENT
Commercial Building REQUIRES RESUBMIT Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.
1. Prior to 2010, structures existing on these parcels. Existing Utility lines exist underground, therefore Utility Easements and agreements exists. Please ensure that these are addressed in the way of abandonment or new utility easements and agreements executed for the new configuration.
2. Please resubmit.
External Reviewers - Pima County Wastewater (RWRD) REQUIRES RESUBMIT We will require resubmit until customer provides an Approval Letter from RWRD, prior to PDSD Approval.
New Services/JOC REQUIRES RESUBMIT TD-DIV-0923-00105 - Land Division_Subdivison v1 – 405 W SPEEDWAY BL

1. The development package shows large portions of stormwater drainage detention and retention basins being constructed in the future rights of way of Speedway Blvd and Main Ave. Per Section 7.11.1.A of the UDC Administrative Manual, these features must be located within a Common Area. The Common Area must be shown on the final plat.

2. The number of lots and the lot numbers on the final plat do not match those shown on Sheet 5 of the development package. Revise as necessary for consistency.

3. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Site Engineering REQUIRES RESUBMIT 1. Add a note in general notes stating that development in Lots 3 and 4 are subject to floodplain regulations.
2. Show detention/retention basins in a surveyable and readily retraceable manner.
3. All retention/detention basins need to be located in a delineated common area owned and maintained by an association.
4. The detention/retention basins and associated common areas can not be shown in the future right-of-way.
5. Show the future right-of-way on the plat.
6. The number of lots proposed does not match what is shown in the tentative plat.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Speedway at Main – Lots 1-4
FINAL PLAT (1st Review)
TD-DIV-0923-00105

TRANSMITTAL DATE: October 11, 2023

DUE DATE: October 18, 2023

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.

2-07.5.0 CONTENT REQUIREMENTS

2-07.5.1 General

1. COMMENT: 2-07.5.1.A.3 – Label all subdivisions within the 1 square mile on the location map.

2. COMMENT: 2-07.5.1.H - The subdivision case number, TD-DIV-0923-00105, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

Additional Comments:

3. 2-07.5.2.A – General Note 7 will need to be completed prior to recordation of this plat.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter.
If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness REVIEW COMPLETED
CDRC Review Coordinator REVIEW COMPLETED Addressing review required, review request email sent per ADOT, TEP, ASSESSORS. FYI email sent per SOP.
External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED [EXTERNAL] Re: DUE OCT 18TH, 2023 / MINOR SUBDIVISION - 4 LOTS - FINAL PLAT / TD-DIV-0923-00105

Jay Gomes
CDRC
Good Morning,

ADOT has no comments on this DIV.

Thank you for the opportunity to review.
External Reviewers - Pima Association of Governments REVIEW COMPLETED FYI email sent per SOP.
External Reviewers - Pima County Assessor REVIEW COMPLETED Plat meets Assessor’s Office requirements.
External Reviewers - Southwest Gas REVIEW COMPLETED FYI email sent per SOP.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Greetings,
Tucson Electric Power Co., (TEP) has reviewed and has no objection to plat submitted September 21st , 2023. Costs for removing or relocating existing TEP facilities will be billable to the developer. There are existing TEP facilities within the boundaries of the plat. Costs for removing or relocating existing TEP facilities will be billable to the developer.
Please call the New Construction Department at 520-918-8300 to apply for service for new development. If easements are required for new TEP facilities, they will be obtained by separate instrument.

Respectfully,
Tucson Electric Power Co.
Land Resources Department
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED FYI email sent per SOP.
Fire New Construction REVIEW COMPLETED
OK to Submit - Engineering REVIEW COMPLETED
OK to Submit - Zoning REVIEW COMPLETED