Plan Review Detail
Plan Number: TD-DIV-0923-00103
Parcel: 121093710
Review Status: Requires Resubmit
Review Details: LAND DIVISION/LOT SPLIT v.1
Plan Number - TD-DIV-0923-00103
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Site Zoning | APPROVED | ||||
| Record Documents Express | PENDING ASSIGNMENT | ||||
| Commercial Plumbing | REQUIRES RESUBMIT | Verify that each of the proposed lots has access to a water meter from Tucson Water (i.e. no remote water meters). For the purposes of having a water meter, a parcel is required to have a minimum width of 15-feet of frontage on a water main. An easement is not considered to be frontage. Reference: Tucson Water Remote Meter Policy, Number IV-B.08, dated 07/14/2009 | |||
| Site Engineering | REQUIRES RESUBMIT | DP17-0182 revision needs to be reviewed to ensure new proposed lot configurations function with prior drainage plan. Please wait for comments on DP review and or additional comments related to this lot line adjustment prior to resubmittal. Joshua Garcia joshua.garcia@tucsonaz.gov |
|||
| TW New Development Review | REQUIRES RESUBMIT | TD-DIV-0923-00103 - Land Division_Land Split_Lot Split v1 – 2121 N CRAYCROFT RD 1. The proposed lot re-configuration is acceptable. A revised water master plan has been recently reviewd and accepted by Tucson Water that shows each of the reconfigured lots and existing Lot 10 will have adequate access to a public water main. 2. Water easements were created on Lots 11, 12, 13 & 14 by the Pima Medical Campus, Lots 1- 14 final plat recorded at Seq. No. 1220181080579. These easements were not shown in the Exceptions on the submitted ALTA Commitment for Title Insurance, but I have not been able to find any record of these easements having been released on the Pima County Recorder’s website. (The Pima County Recorder’s website does show a partial release of these easements recorded at Seq. No. 20200730976, but that partial easement release applies to only those portions of this easement on Lots 5 & 6. Please revise the Lot Reconfiguration Exhibit to show these water easements on Lots 11, 12, 13, and 14 and indicate whether they are TO REMAIN or TO BE RELEASED BY SEPARATE INSTRUCMENT or provide documentation that these easements have been released. 3. The submitted ALTA Commitment for Title Insurance indicates there are existing easements on original lot 14, that were granted to Tucson Electric Power and re-recorded at Seq. No. 20203150760 and Seq. No. 20203080732 for the purpose of electric lines and appurtenant facilities for the transmission and distribution of electricity. These easements haven’t been shown on the Lot Reconfiguration Exhibit. Please revise the Lot Reconfiguration Exhibit to show these electric easements and indicate whether they are TO REMAIN or TO BE RELEASED BY SEPARATE INSTRUCMENT or provide documentation that these easements have been released. 4. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| Commercial Building | REVIEW COMPLETED | No existing commercial structure. Please make sure to locate all Utilities on all three parcels in case Utility access agreement has to be resolved. | |||
| Residential Building | REVIEW COMPLETED |