Plan Review Detail
Review Status: Approved
Review Details: LAND DIVISION/SUBDIVISION v.2
Plan Number - TD-DIV-0826-00054
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Site Engineering Standard | APPROVED | ||||
| Site Zoning Standard | APPROVED | ||||
| Design Review Standard | NOT REQUIRED | ||||
| External Reviewers - Pima County Wastewater (RWRD) Standard | NOT REQUIRED | ||||
| Historic Standard | NOT REQUIRED | No comments. Land division/subdivision does not trigger Historic review. | |||
| NPPO Standard | NOT REQUIRED | ||||
| Residential Building Standard | NOT REQUIRED | ||||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| CDRC Post Review Express | REVIEW COMPLETED | October 2, 2026 Rick Engineering Attn: Steven Vasquez 3945 E Fort Lowell Rd Ste 111 Tucson, AZ 85712 Subject: Final Plat for (TD-DIV-0826-00054) One West Broadway Condominiums The above-referenced project has been conditionally approved by the City Development Review Committee (CDRC). Please hand-deliver items to 1st floor of PDSD for us to obtain City staff's signatures: 1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank. 2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid. 3. Pima County Recorder’s Office now requires separate payments for recording of plats and other documents. Please provide both payments a, b, and c via separate checks or money orders a. $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee) b. $30.00 per document for Consent to Dedicate (if applicable) c. $30.00 per document for CC&R (if applicable) The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder’s Office at 520-740-4350. Check must be pre-printed with name and address. Please make the checks payable to the Pima County Recorder. 4. Original set of executed and notarized CC&R (if applicable). 5. Consent to Dedicate documentation (if applicable). 6. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement. The Final Plat, CC&R, and Assurance Agreement must be approved at the same time of recording. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney’s Office prior to recording. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk’s Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro. Should you have questions, contact Aaron F. Building Permit Specialist at 520-837-4921 or cdrc@tucsonaz.gov. xc: Project Record by Activity Number |
|||
| CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added Addressing, Assessor, Real Estate, Historic, Design Professional, Environmental Services, RWRD, ADOT, TAA, PAG, SWG, USPS, TEP to the workflow. FYI notice sent out to PAG, SWG, USPS, TEP. | |||
| Commercial Building Standard | REVIEW COMPLETED | ||||
| Commercial Plumbing Standard | REVIEW COMPLETED | ||||
| Entitlements Standard | REVIEW COMPLETED | ||||
| External Reviewers - Arizona Department of Transportation (ADOT) Standard | REVIEW COMPLETED | CDRC ADOT has no comments. Thanks, Rick Freije |
|||
| External Reviewers - COT Environmental Services Standard | REVIEW COMPLETED | ES has no objections to the proposed condo development. The proposed DP must include provisions for for Trash and Recycle solid waste storage and collection per TSM 8-01.0. Must include all detail of equipment/container storage area, collection service and staging area, with all structural detail as applicable. Andy Vera (520) 837-3798 Andy.Vera@tucsonaz.gov |
|||
| External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | |||
| External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | Good afternoon, Pima County Addressing approves TD-DIV-0826-00054. Thank you, David Wilging Planner I - Addressing Division Pima County Development Services 201 N. Stone Avenue 1st Floor Tucson, Arizona 85701 520-724-6381 |
|||
| External Reviewers - Pima County Assessor Standard | REVIEW COMPLETED | Office of the Pima County Assessor 240 N. Stone Ave. Tucson, Arizona 85701 SUZANNE DROUBIE PIMA COUNTY ASSESSOR TO: City of Tucson Development Services FROM: Michael Bell GIS Technician Pima County Assessor’s Office Michael.Bell@pima.gov (520)724-7503 DATE: September 29, 2026 RE: Assessor’s Review and Comments Regarding: (SUBMITTAL) TD-DIV-0826-00054 – One West Broadway Condominiums * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X _ Plat meets Assessor’s Office requirements. __ __ Plat does not meet Assessor’s Office requirements. COMMENTS: NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. AUTOCAD DWGS CAN BE SENT TO THE EMAIL ABOVE AND/OR ASRGIS@PIMA.GOV. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
|||
| External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | |||
| External Reviewers - Tucson Airport Authority Standard | REVIEW COMPLETED | September 29, 2026 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DIV-0826-00054, 1st Submittal, Condominium Plat for One West Broadway | 1 W Broadway Boulevard, Tucson, AZ. 85701, Received September 7, 2026 To whom this may concern, Thank you for the opportunity to comment on TD-DIV-0826-00054, 1st Submittal, a subdivision plan for converting an existing apartment building into a new condominium building at 1 W Broadway Boulevard. This development is located in the N.E. quarter of the N.W. quarter of Section 13, Township 13S, Range 14E, of the Gila and Salt River Meridian. The development site occupies parcel number 117-13-029A, covers approximately 0.506 ± acres, and is zoned as Commercial 3 Zone (C-3) and Office Commercial Residential 2 Zone (OCR-2). The nearest major roadway intersection is West Broadway Boulevard and South Stone Avenue, approximately 50 feet to the northeast of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority does not object to the first submittal of this project and is not requiring a resubmittal. Although this project does not propose a change in plan designation or zoning the Tucson Airport Authority highly recommends the applicant add the following notes into the general notes of the revised development plan. This project is located approximately 6 miles north of Tucson International Airport and is within FAA traffic pattern airspace, an area which would be subject to aircraft overflight and noise due to being in close proximity to Tucson International Airport. The proposed notes would provide a means of assuring that future owners and tenants of the property are aware they are in proximity an airport and further assures the continued right of the City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson International Airport the right to utilize the airspace above or near the property. This would be accomplished through the property owner recording the Avigation Easement and providing the Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport Authority believes the proposed note helps to support the City of Tucson Airport Environs Overlay Zone and supports Plan Tucson – Land Use 26. 1. "That prior to the City's approval of the proposed development, the property owner must record the Avigation Easement that discloses the existence and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided.” The current property owner or person authorized to sign on behalf of the current property owner must complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder’s Office. Then send a complete copy of the recorded easement document to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below. Scott Robidoux Manager of Planning Tucson Airport Authority 7250 South Tucson Blvd, Suite 300 Tucson, AZ 85756” 2. Applicable to residential uses only “The property owner/developer/applicant must provide the Airport Disclosure Statement form, at time of sale, to the new property owners with all new unit purchases. In the event the development of any residential uses does not involve the sale of new units but is instead offering rental residential units to the public, the new tenant of the rental unit must be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided.” The property owner (for itself or its tenants) shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority within ten (10) days of signature, using the Scott Robidoux mailing address provided above. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520- 573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning cc file |
|||
| External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | |||
| External Reviewers - Tucson Electric Power (TEP) Standard | REVIEW COMPLETED | Tucson Electric Power (TEP) has reviewed and approves the Final Plat for Condominium Plat for One West Broadway. TEP does have facilities and easements within the bounds of this development. Any costs for removal or relocation of existing electrical facilities, if required, will be billable to the developer. Should additional easements be required for new development within the platted area, they will be obtained by separate instrument. If you have any questions, please feel free to contact me at (520) 965-4030. Thank you, Liza Castillo Right-of-Way Consultant for Tucson Electric Power Co. Land Resources (520) 965-4030 tepdevrev@tep.com |
|||
| External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI Notice email sent. No further action is required. | |||
| Fire New Construction Standard | REVIEW COMPLETED | ||||
| MITZ District Standard | REVIEW COMPLETED | ||||
| New Services/JOC Standard | REVIEW COMPLETED | Tucson Water has no objection to the proposed condominium plat, provided the existing water service configuration remains unchanged. Water service for the units and common elements shall remain the responsibility of the association, as outlined in Section 6.6 of the Condominium Declaration. Any new meters or modifications to the existing water service associated with future development shall be coordinated with Tucson Water New Services. |
|||
| OK to Submit - Engineering Fast | REVIEW COMPLETED | ||||
| OK to Submit - Zoning Fast | REVIEW COMPLETED | ||||
| Real Estate Standard | REVIEW COMPLETED | All improvements should be located within property boundaries and aerial easement limits. Any balconies or other improvements that will extend beyond (or in areas not covered by) the aerial easement at Seq#20152850149 will require an application with the Real Estate Division for additional rights. Please contact the Real Estate Division if needed 520-791-4181. |