Plan Number: TD-DIV-0823-00097
Parcel: 12217135A

Address:
3432 E LEE ST

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-0823-00097
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
CDRC Post Review Express PENDING ASSIGNMENT
CDRC Review Coordinator Express PENDING ASSIGNMENT
Commercial Building PENDING ASSIGNMENT
Commercial Plumbing PENDING ASSIGNMENT
Fire New Construction PENDING ASSIGNMENT
New Services/JOC PENDING ASSIGNMENT
NPPO PENDING ASSIGNMENT
Residential Building PENDING ASSIGNMENT
Site Engineering PENDING ASSIGNMENT
Site Zoning PENDING ASSIGNMENT
OK to Submit - Engineering Fast REQUIRES RESUBMIT 1. See Zoning comments regarding plat requirements
2. As the proposed parcel is within a COT floodplain, a minor subdivision is not valid for this land split. Please modify proposed subdivision to a block plat (same requirements under AM 2-07, simply needs to change the name)

Scott Haseman
scott.haseman@tucsonaz.gov
OK to Submit - Zoning Fast REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Lee St. Minor Subdivision
3432 E. Lee St. – R-1
TD-DIV-0823-00097

TRANSMITTAL DATE: August 24, 2023

The minor subdivision, final plat, has been reviewed by the Zoning Review Section for minimal compliance with the Administrative Manual Section (AM) 2-07. The plan submitted does not meet the requirements of AM 2-07. Review AM 2-07 and provide a final plat that meets all requirements of the AM.

The final plat will not show any existing development. A supplemental plot plan meeting the requirements found at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example, is required. The supplemental plot plan is a separate plan submitted along with the plat and will clearly demonstrate that all development requirements, i.e., lot coverage, perimeter yard setbacks to the new property line, are met.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED