Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TD-DIV-0726-00049
Parcel: 107112480

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-0726-00049
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
CDRC Post Review Express PENDING ASSIGNMENT
CDRC Review Coordinator Express PENDING ASSIGNMENT
Commercial Building Standard PENDING ASSIGNMENT
Commercial Plumbing Standard PENDING ASSIGNMENT
Entitlements Standard PENDING ASSIGNMENT
Fire New Construction Standard PENDING ASSIGNMENT
New Services/JOC Standard PENDING ASSIGNMENT
NPPO Standard PENDING ASSIGNMENT
Residential Building Standard PENDING ASSIGNMENT
Site Engineering Standard PENDING ASSIGNMENT
Site Zoning Standard PENDING ASSIGNMENT
OK to Submit - Engineering Fast REQUIRES RESUBMIT Site Engineering Review

TD-DIV-0726-00049
3025 N GERONIMO AV

Date of Transmission: 8/4/2026

Description: 5 lot subdivision at 3025 North Geronimo Avenue

Site Engineering comments are as follows:

1. This minor subdivision is not permissible as proposed. The four lots to the west of Lot 5 do not have the minimum 15 feet of real property frontage to Geronimo. Access must meet street standards, and a fire turn-around would be required.

*Please submit revised drawings along with a detailed response letter stating how each resubmittal comment has been addressed*

To re-submit, visit the Tucson Development Center Online at:
https://tdc-online.tucsonaz.gov/#/home

The instructions for resubmittal can be found at: Revisions and Resubmittals

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
OK to Submit - Zoning Fast REQUIRES RESUBMIT 1. COMMENT: Per UDC 7.8.4.C "If access is provided by an easement and the easement serves more than two single-family homes the City may require the easement to be developed as a street or as a parking area access lane (PAAL). The determination as to whether a developed street or PAAL is required will be made at the time of review of the proposed land division or development of the property based on the need for public services, such as utilities, refuse collection, and fire suppression, and on the projected average daily traffic (ADT) of the access easement." Clarify how the proposed land division is addressing this requirement.

Loran Shamis
loran.shamis@tucsonaz.gov
CDRC Application Completeness Express REVIEW COMPLETED Please add a Graphic Scale