Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.1
Plan Number - TD-DIV-0626-00038
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| NPPO Standard | APPROVED | At tentative plat/development package submittal a NPPP or NPPO Waiver will be required. Thank you. Chad Keller, PLA chad.keller@tucsonaz.gov |
|||
| Fire New Construction Standard | NOT REQUIRED | ||||
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Assessor Standard | REQUIRES RESUBMIT | FROM: Michael Bell GIS Technician Pima County Assessor’s Office Michael.Bell@pima.gov (520)724-7503 DATE: July 14, 2026 RE: Assessor’s Review and Comments Regarding: (SUBMITTAL) TD-DIV-0626-00038 – 10000 E OLD VAIL SIT B * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * _ Plat meets Assessor’s Office requirements. _X __ Plat does not meet Assessor’s Office requirements. COMMENTS: The title block must be in the lower right-hand corner and it must have the number of lots or units or blocks or elements or any combination of these. It must have the Common Areas listed if there are any. It must have the section, township, and range and if it is a resubdivision, it must mention the plat name and the map & plat. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. The perimeter line must be solid and the heaviest lineweight on the plat. The lot lines and Common Area lines must be solid and the next heaviest. Lines for erosion setbacks, floodplain lines etc. should be the lightest lineweight and be dashed or dot-dashed. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. AUTOCAD DWGS CAN BE SENT TO THE EMAIL ABOVE AND/OR ASRGIS@PIMA.GOV. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
|||
| External Reviewers - Pima County Wastewater (RWRD) Standard | REQUIRES RESUBMIT | The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit. | |||
| External Reviewers - Tucson Electric Power (TEP) Standard | REQUIRES RESUBMIT | Plan Number: TD-DIV-0626-00038 Plan Type: Land Division Description: Final Plat for creation of 10 separate lots Address: Yes Parcel: 14118602B Name of Subdivision: 10000 E Old Vail Site B Tucson Electric Power Co. (TEP) has reviewed the final plat submitted on June 22, 2026, and is unable to approve the plat. The existing non-exclusive utility easement recorded in Docket-7846 at Page-391 (attached) must be shown on the plat. If you have any questions, please contact me at 520-965-4030. Thank you, Liza Castillo Right-of-Way Consultant for Tucson Electric Power Co. Land Resources (520) 965-4030 tepdevrev@tep.com |
|||
| New Services/JOC Standard | REQUIRES RESUBMIT | Tucson Water cannot approve this land division at this time. Please provide a revised plan showing the proposed water easements and how Lots 7 through 10 will obtain legal and physical access to public water service. | |||
| Site Engineering Standard | REQUIRES RESUBMIT | Site Engineering Review TD-DIV-0626-00038 9915 E OLD VAIL RD Permit Summary: Final Plat for creation of 10 separate lots Site Engineering comments are as follows: 1. Include, “Tucson” in the title blocks. 2. Provide the actual plan number, TD-DIV-0626-00038, where required. 3. Provide the Surveyor’s Seal where appropriate. 4. Address the resubmittal comments by the other reviewers. 5. Additional comments may be forthcoming depending on the content of files submitted for subsequent review cycles. *Please submit revised drawings along with a detailed response letter stating how each resubmittal comment has been addressed* To re-submit, visit the Tucson Development Center Online at: https://tdc-online.tucsonaz.gov/#/home The instructions for resubmittal can be found at: Revisions and Resubmittals Engineering Associate: Ryan Insalaco ryan.insalaco@tucsonaz.gov |
|||
| Site Zoning Standard | REQUIRES RESUBMIT | 1. COMMENT: The docket number for the "Existing 5' Utility Easement per Dkt. 846, Pg. 391" is incorrect as should read "7846" instead. 2. COMMENT: Final Site Zoning approval for this final plat document cannot be granted until the related tentative plat, TD-DEV-0626-00149, is first approved. Contact Fernando Garcia, Lead Planner, Site Zoning at fernando.garcia2@tucsonaz.gov. |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC added Assessors and Addressing to the workflow. Review request email sent to Addressing and Assessors.FYI email sent to TEP and SWG | |||
| Commercial Building Standard | REVIEW COMPLETED | ||||
| Commercial Plumbing Standard | REVIEW COMPLETED | ||||
| Entitlements Standard | REVIEW COMPLETED | ||||
| External Reviewers - Pima County Addressing Standard | REVIEW COMPLETED | Good afternoon, Pima County Addressing approves TD-DIV-0626-00038. Please note the admin address for this parcel and project is 9915 E. Old Vail Rd. Thank you, David Wilging Planner I - Addressing Division Pima County Development Services 201 N. Stone Avenue 1st Floor Tucson, Arizona 85701 520-724-6381 |
|||
| OK to Submit - Engineering Fast | REVIEW COMPLETED | ||||
| OK to Submit - Zoning Fast | REVIEW COMPLETED | ||||
| Residential Building Standard | REVIEW COMPLETED |