Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.1
Plan Number - TD-DIV-0625-00073
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| CDRC Review Coordinator Express | PENDING ASSIGNMENT | ||||
| Commercial Building Standard | PENDING ASSIGNMENT | ||||
| Commercial Plumbing Standard | PENDING ASSIGNMENT | ||||
| Entitlements Standard | PENDING ASSIGNMENT | ||||
| Fire New Construction Standard | PENDING ASSIGNMENT | ||||
| New Services/JOC Standard | PENDING ASSIGNMENT | ||||
| NPPO Standard | PENDING ASSIGNMENT | ||||
| Residential Building Standard | PENDING ASSIGNMENT | ||||
| Site Engineering Standard | PENDING ASSIGNMENT | ||||
| Site Zoning Standard | PENDING ASSIGNMENT | ||||
| OK to Submit - Zoning Fast | REQUIRES RESUBMIT | This parcel was previously split. Per UDC Section 8.3.1, it does not meet the requirements for a "land split" and must instead be processed as a "Minor Subdivision". Please submit documents that meet requirements of Administrative Manual 2-07: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8971. A final plat will be required. If any existing improvements, including structures, are present on the site, then a supplemental site plan will also be required. See the following link for an example of a site plan: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Plan-Examples/Plot-Plan-Example |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| OK to Submit - Engineering Fast | VOID | This parcel was previously split. Per UDC Section 8.3.1, it does not meet the requirements for a "land split" and must instead be processed as a "Minor Subdivision". Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |