Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-0624-00052
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Plumbing APPROVED
External Reviewers - COT Parks & Recreation APPROVED Approved TD-DIV-0624-00052 Address Regards, Joe Barr Project Manager Tucson Parks and Recreation
NPPO APPROVED
CDRC Post Review Express PENDING ASSIGNMENT
External Reviewers - Pima County Wastewater (RWRD) REQUIRES RESUBMIT The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit.
New Services/JOC REQUIRES RESUBMIT TD-DIV-0624-00052 - Land Division_Subdivision v1 – 5020 E GLENN ST

Tucson Water has the following comment regarding the proposed subdivision plat.

1. Final Plat Sheet 3: This sheet shows features such as buildings, parking spaces, etc. that are not typically shown on a final plat. Please delete it from the final plat, OR if it shows information you wish to convey to the reviewers, submit it as a separate document.

2. Final Plat Sheet 2: The center line of Wyatt Drive and the easternmost boundary of the water easement granted by Docket 8520, Page 800 overlap in many areas, causing a solid line to be shown in those areas. Solid lines should only be used on final plats to show some kind of property line. Where the center line and the easternmost easement boundary overlap, show just the centerline.

3. Final Plat Sheet 2: Please add the Keynote 2 symbol to those portions of the water easement granted by Docket 8520, Page 800 that lie east of the centerline of Wyatt Drive.

4. Final Plat Sheet 2: The arrowhead symbols shown on the easternmost ROW line of Wyatt Drive appear to be extraneous symbols, not needed on this final plat. If so, delete them. If not, show and describe an example of these symbols in the legend and explain what they mean.

5. Final Plat Sheet 1, Dedication: If you are not granting any new easements, the 2nd & 3rd paragraphs are not necessary. If you are granting new easements show them on Sheet 2.

6. Final Plat Sheet 1, Dedication: If you are not creating any new private streets, drainageways or common areas, the 4th paragraph is not necessary. If you are creating any of these new features, show them on Sheet 2.

7. A RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised final plat that addresses these comments and a detailed response letter.
Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Site Engineering REQUIRES RESUBMIT 1. Remove sheet 3 from Final Plat and renumber sheets 1&2 of 2.
2. Revise General Notes 7-8, & 10 to read "owner(s)" and eliminate homeowner's association unless you refer to an existing property owners association.
3. Correct spelling in Dedication language (hereon in 2nd paragraph) or remove if no new easements are being created.
Joshua Garcia
joshua.garcia@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Tucson Medical Center Lot 13 – Lots 13-1 THRU 13-3
FINAL PLAT (1st Review)
TD-DIV-0624-00052

TRANSMITTAL DATE: July 9, 2024

DUE DATE: July 15, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.

2-07.5.0 CONTENT REQUIREMENTS

2-07.5.1 General

1. COMMENT: 2-07.5.1.H - The subdivision case number, TD-DIV-0624-00052, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

2. COMMENT: Remove sheet 3 from the plat set and submit as a separate sheet as this sheet will not be recorded with the plat.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter.
If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED
CDRC Review Coordinator Express REVIEW COMPLETED Added external reviewers, sent emails and sent FYI emails per SOP.
Commercial Building REVIEW COMPLETED
Entitlements REVIEW COMPLETED
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email, no further action is required from customer at this time.
External Reviewers - Pima County Addressing REVIEW COMPLETED Good morning,
Pima County Addressing approves TD-DIV-0624-00052.
Nicholas Jordan
Site Review Project Manager II – Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email, no further action is required from customer at this time.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED July 15, 2024
WO#T118786
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Tucson Medical Center Lot 1-14
TD-DIV-0624-00052
Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 6/13/2024. There are existing facilities which are not depicted upon the plan and are not reflected upon the submitted plat.
Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans.
If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Chuck Leon
(520) 400-6133
cleon@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email, no further action is required from customer at this time.
Fire New Construction REVIEW COMPLETED
OK to Submit - Engineering Fast REVIEW COMPLETED
OK to Submit - Zoning Fast REVIEW COMPLETED
Residential Building REVIEW COMPLETED
ROW Engineering Review REVIEW COMPLETED No Comments