Plan Number: TD-DIV-0524-00048
Parcel: 113070990

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.2

Plan Number - TD-DIV-0524-00048
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Plumbing APPROVED
External Reviewers - Pima County Wastewater (RWRD) APPROVED Record P24WC00189:
Capacity Letter
Record Status: Issued
New Services/JOC NOT REQUIRED See my comments in my TW New Development Review.
NPPO NOT REQUIRED Prior to grading and dp approval an NPPO may be required.

Chad Keller, RLA
chad.keller@tucsonaz.gov
CDRC Post Review Express PENDING ASSIGNMENT
External Reviewers - Pima County Assessor REQUIRES RESUBMIT Office of the Pima County Assessor 240 N STONE AVENUE Tucson, Arizona 85701 SUZANNE DROUBIE ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Julieann Arechederra GIS Cartographer Pima County Assessor’s Office DATE: July 25, 2024 RE: Assessor’s Review and Comments Regarding: RANCHO RUSTICO LOTS 1-3 TD-DIV-0524-00048 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor’s Office requirements. ____X__ Plat does not meet Assessor’s Office requirements. COMMENTS: • THE TITLE BLOCK MUST BE IN THE LOWER RIGHT HAND CORNER. IT MUST HAVE THE NUMBER OF LOTS OR UNITS OR BLOCKS OR ANY COMBINATION OF THESE. IT MUST HAVE THE COMMON AREAS LISTED, IF THERE ARE ANY. IT MUST HAVE THE SECTION, TOWNSHIP AND RANGE AND IF IT IS A RESUBDIVISION, IT MUST MENTION THE PLAT NAME AND THE MAP AND PLAT. • THE LOCATION MAP MUST BE IN THE UPPER RIGHT HAND CORNER AND MUST HAVE THE SECTION, TOWNSHIP AND RANGE. THE PROJECT AREA SHOULD BE OUTLINED OR HAVE AN ARROW POINT TO IT. • GENERAL NOTES MUST HAVE THE GROSS AREA OF THE SUBDIVISION, THE NUMBER OF LOTS, THE NUMBER OF MILES OF NEW ROAD, PUBLIC OR PRIVATE, EVEN IF THE NUMBER IS 0, AND THE BASIS OF BEARING. “Please note that our office follows A.R.S. 33-1204. Pursuant to this statue the properties will not be assigned an Assessor’s parcel number until a conveyance to a new owner for a specific unit is filed in the Office of the Pima County Recorder’s.” NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED
Site Engineering REQUIRES RESUBMIT 1. Subdivision Title Block. Subdivision name needs to state "A resubdivision of the east 106' of lot 10....."
2. General Notes per Admin Manual 2-07.5 are required.
The gross area of this subdivision is 0.70 acres.
The total number of lots is 3.
Total miles of new streets is 0.
There will be no further division of lots without the expressed approval of the City of Tucson.
3. Certification of Survey needs to include "I further certify that this plat was prepared under my direction."
4. Certification of Title is required.
5. Dedication language is required including hold-harmless statement.
6. Approval block and recording block are required.
7. Assurances statement with signature lines for City of Tucson Planning & Development Services director and City of Tucson Engineer.
8. Section tie is required.
Joshua Garcia
joshua.garcia@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Rancho Rustico Lots 1 thru 3
FINAL PLAT (1st Review)
TD-DIV-0524-00048

TRANSMITTAL DATE: July 30, 2024

DUE DATE: August 1, 2024

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.

2-07.5.0 CONTENT REQUIREMENTS

2-07.5.1 General

1. COMMENT:2-07.5.1.E.3 – As this is a resubdivion of a final plat state so in the title block along with the book and page/sequence number reference of the existing subdivision.

2. COMMENT: 2-07.5.1.H - The subdivision case number, TD-DIV-0524-00048, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

2-07.5.2 General Notes

The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.

3. COMMENT: 2-07.5.2.A – Provide a general note stating, “The gross area of this subdivision is ____ acres.”

4. COMMENT: 2-07.5.2.B – Provide a general note stating, “The total number of lots is 3.”

5. COMMENT: 2-07.5.2.C – Provide a general note stating, “Total miles of new public streets are ____.”, and “Total miles of new private streets are ____.”.

6. COMMENT: 2-07.5.2.H – Provide a general note stating, “There will be no further division of lots without the expressed approval of the City of Tucson.”

7. COMMENT: 2-07.5.2.J –
2-07.5.3 Standard Paragraphs

The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.

8. COMMENT: 2-07.5.3.D – Provide the required Approval block on the plat.

ADDITIONAL COMMENTS

9. COMMENT: Remove the Lot coverage from the final plat.

10. COMMENT: The lot coverage provide for parcel 1 on the tentative plat is not correct. Per UDC Article 6.4.3.B.3.b Vehicular use areas, measured within the outside edges of any area allocated to vehicle use, whether improved or unimproved are included in the lot coverage.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter.
If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED
CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent to Addressing, TEP, and Assessors. FYI email to PAG, USPS, SWG.
Commercial Building REVIEW COMPLETED
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
External Reviewers - Pima County Addressing REVIEW COMPLETED Good afternoon,



Pima County Addressing approves TD-DIV-0524-00048.



Nicholas Jordan

Site Review Project Manager II – Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Greetings,
Tucson Electric Power Co. (TEP) has reviewed and has no objection to TD-DIV-0524-00048, submitted on June 27th, 2024. The developer will be billed for the costs of removing or relocating existing TEP facilities.
Please call the New Construction Department at 520-918-8300 to apply for service for new development. Please submit a final set of approved plans, including electrical load and offsite improvement plans, to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument.
Respectfully,
Tucson Electric Power Co.
Land Resources Department
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS, SWG. No further action is required from the customer at this time.
Fire New Construction REVIEW COMPLETED
OK to Submit - Engineering Fast REVIEW COMPLETED
Residential Building REVIEW COMPLETED
ROW Engineering Review REVIEW COMPLETED
TW New Development Review REVIEW COMPLETED TD-DIV-0524-00048 - Land Division_Subdivision v2 – 1653 E BLACKLIDGE DR
1st Review by Tucson Water on 07/30/2024

The lot layout on this submittal complies with Tucson Water’s Remote Meter Policy No. IV-B.08, Eff. 07/14/2009. Tucson Water has no objections to the proposed Land Split / Lot Split. If the lot layout is changed on a future submittal, this approval becomes void.

Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov