Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.3
Plan Number - TD-DIV-0524-00047
Review Name: LAND DIVISION/SUBDIVISION v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Commercial Plumbing | APPROVED | ||||
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| Site Engineering | REQUIRES RESUBMIT | The sewer easement proposed for lots 2 & 3 appear to indicate a shared sewer connection to the sewer main. This must be either a Public sewer main with individual HCS's to each lot, or an appeal to the City of Tucson Building Official will be required prior to approval of the Final Plat, and a tentative plat will be required to show the shared improvements. Joshua Garica joshua.garcia@tucsonaz.gov |
|||
| Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: PDSD Zoning Review PROJECT: El Mesquite – Lots 1 thru 3 FINAL PLAT (2nd Review) TD-DIV-0524-00047 TRANSMITTAL DATE: December 19, 2024 DUE DATE: December 13, 2024 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 1. Zoning acknowledges that the setback waiver is provided but it has not be signed. Until signed Zoning cannot approve this plat. COMMENT: - The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). The existing 400 Sq. Feet building does not meet the minimum 6’-0” setback. At a minimum a neighbors setback waiver is required. To secure this neighbor setback waiver the following statement must be provided on the plot plan and be signed and dated by the adjacent property owner(s): My Name is____________________ and I am the owner of the property located at_______________________. I have reviewed the site plan and I have no objection to structure being located or constructed________ feet from the property line as depicted on the site plan. Signature: _____________________________ Date: _________________________________ If you are not able to secure the waiver a Design Development Option (DDO) must be submitted and approved. DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. If you have questions about the DDO application or process please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. . |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| External Reviewers - Pima County Assessor | REVIEW COMPLETED | Office of the Pima County Assessor 240 N. Stone Ave. Tucson, Arizona 85701 SUZANNE DROUBIE PIMA COUNTY ASSESSOR TO: City of Tucson Development Services FROM: Karl Christensen GIS Analyst II Pima County Assessor’s Office Karl.Christensen@pima.gov (520)724-3125 DATE: December 12, 2024 RE: Assessor’s Review and Comments Regarding: (SUBMITTAL 2) TD-DIV-0524-00047 – EL MESQUITE - FINAL PLAT * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. Plat does not meet Assessor’s Office requirements. COMMENTS: This plat meets the Assessor’s Office’s requirements for a Final Plat. However, I want to suggest that before Recordation the applicant considers normalizing the printed ownership information on the plat with Assessor ownership data. This will ensure no possible issues with chain of title research performed in the future by title companies, etc.; or when the Assessor’s Office processes the Recorded plat. For reference, the Assessor’s Office currently shows ownership of APN 140-25- 004B currently being held by: RODRIGUEZ FRANK C & MARIA CRISTINA CP/RS per the grantee names of the Warranty Deed Recorded at Sequence: 19981580515. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. AUTOCAD DWGS CAN BE SENT TO THE EMAIL ABOVE AND/OR ASRGIS@PIMA.GOV. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |