Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Plan Number: TD-DIV-0523-00065
Parcel: 133100080
Review Status: Requires Resubmit
Review Details: LAND DIVISION/LOT SPLIT v.1
Plan Number - TD-DIV-0523-00065
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Commercial Building | APPROVED | ||||
Residential Building | APPROVED | ||||
Site Engineering | APPROVED | ||||
Site Zoning | APPROVED | ||||
Record Documents | REQUIRES RESUBMIT | Here are your next steps to finalize the project: 1. Submit a copy of the approved and stamped drawings to the Pima County Recorder's office to record the legal descriptions and survey. You should receive a receipt for the recordation and the warranty deeds for the parcels. 2. Submit a copy of the warranty deeds to Pima County Addressing so that the office can ensure the property addresses and parcel numbers are correct. You should receive a receipt or document showing the new or existing addresses on new parcels. 3. Submit the following documents for your land division into the TDC Online portal: A. Warranty Deeds (from Recorder's Office) with affixed label showing date it was recorded and the Sequence number B. Receipt or document (from Addressing) showing the new address(es) |
|||
CDRC Application Completeness | REVIEW COMPLETED | ||||
Commercial Plumbing | REVIEW COMPLETED | ||||
TW New Development Review | REVIEW COMPLETED | TD-DIV-0523-00065 - Land Division_Land Split_Lot Split v1 – 1285 N SPEEDWAY PL 1. Tucson Water has no objections to Assessor’s Parcel No. 13310004C being split as shown on the submitted drawings, and offers the following comments for your convenience: 2. Please note that the buildable area of Parcel 2 is probably more than 600’ away from the closest fire hydrant. To construct a building on Parcel 2, a new fire hydrant may need to be built at the cul-de-sac bulb of Golden Palamino Place, or a fire suppression sprinkler system may need to installed in the building. 3. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |