Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.2

Plan Number - TD-DIV-0523-00063
Review Name: LAND DIVISION/SUBDIVISION v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Plumbing APPROVED
External Reviewers - Tucson Electric Power (TEP) APPROVED October 6, 2023
WO#T91971
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Lock Plat Parcels Reconfiguration
TD-DEV-0523-00063
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted September 29th 2023. There are no existing facilities within the
development and do not appear to be any conflicts at this time.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans.
If easements are required, they will be secured by separate instrument. Your final
plans should be sent to:
Gabriela Bielecka
Project Manager - RMT
Tucson Electric Power Company
P.O. Box 711 (OH204)
Tucson, AZ, 85702
(520) 651-3833
Should you have any technical questions, please contact the area designer, Chuck
Leon at (520) 400-6133.
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
New Services/JOC APPROVED TD-DIV-0523-00063 - Land Division_Subdivison v2 – 5230 E FORT LOWELL RD

1. Tucson Water has no objections to the proposed subdivision block plat.

2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Residential Building APPROVED
ROW Engineering Review APPROVED
Commercial Building NOT REQUIRED Not Commercial, see Residential Building comment.
CDRC Post Review Express PENDING ASSIGNMENT
Final Plat Package Fast PENDING ASSIGNMENT
External Reviewers - Pima County Assessor REQUIRES RESUBMIT TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)
FROM: Jaclyn Fajardo
GIS Cartographer
Pima County Assessor’s Office jaclyn.fajardo@pima.gov
DATE: 10/04/2023
RE: Assessor’s Review and Comments Regarding:
TD-DIV-0523-00063 Old Fort Lowell 1ST Submittal
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Plat meets Assessor’s Office requirements.
___X___ Plat does not meet Assessor’s Office requirements.
COMMENTS:

· THE TITLE BLOCK MUST BE IN THE LOWER RIGHT HAND CORNER. IT MUST HAVE THE NUMBER OF LOTS OR UNITS OR BLOCKS OR ANY COMBINATION OF THESE. IT MUST HAVE THE COMMON AREAS LISTED, IF THERE ARE ANY. IT MUST HAVE THE SECTION, TOWNSHIP AND RANGE AND IF IT IS A RESUBDIVISION, IT MUST MENTION THE PLAT NAME AND THE MAP AND PLAT.
· GENERAL NOTES MUST HAVE THE GROSS AREA OF THE SUBDIVISION, THE NUMBER OF LOTS, THE NUMBER OF MILES OF NEW ROAD, PUBLIC OR PRIVATE, EVEN IF THE NUMBER IS 0, AND THE BASIS OF BEARING.
· ALL LOTS MUST BE NUMBERED AND HAVE SQUARE FOOTAGE. IF THE AREA IS TOO SMALL, THEY CAN HAVE A TABLE TO THE SIDE FOR THE SQUARE FOOTAGE.
NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
External Reviewers - Pima County Wastewater (RWRD) REQUIRES RESUBMIT We will require resubmit until customer provides an Approval Letter from RWRD, prior to PDSD Approval.
Site Engineering REQUIRES RESUBMIT 1. Place the words “SEQ#____________” in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder’s Office.
2. Title block needs to comply Administrative Manual 2-07.5.1.E. – Subdivision name, number of blocks. State “Final Plat” in the title and title block.
3. The subdivision case number, TD-DIV-0523-00063, must be placed on the lower right corner of the plat next to the title block.
4. Refer to Administrative Manual 2-07.5.2 - General Notes A, B, C, & H are required on this Final Plat.
5. Revise Certification of Survey to match that from the Administrative Manual 2-07.5.3.A.
6. Revise dedications to match signers, either I/We, not both.
7. Provide a copy of the new CC&R’s along with a summary of their purpose.
8. Provide signature lines for PDSD Director and City Engineer.
Joshua Garcia
joshua.garcia@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Old Fort Lowell Plat
FINAL PLAT (1st Review)
TD-DIV-0523-00063

TRANSMITTAL DATE: October 3, 2023

DUE DATE: October 8, 2023

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.

2-07.5.0 CONTENT REQUIREMENTS

2-07.5.1 General

1. COMMENT: 2-07.5.1.A – The scale of the location map is not correct.

2. COMMENT: 2-07.5.1.A.2 – Label the section corners on the location map.

3. COMMENT: 2-07.5.1.D – Place the words “SEQ#________” in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder’s Office at the time of recordation.

4. COMMENT: 2-07.5.1.E.1 – Provide the n umber of lots within the title block

5. COMMENT: 2-07.5.1.H - The subdivision case number, TD-DIV-0523-00063, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

6. COMMENT: 2-07.5.1.H.I –

2-07.5.2 General Notes

The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.

7. COMMENT: 2-07.5.2.A – Provide a general note stating “The gross area of this subdivision is ____ acres.”

8. COMMENT: 2-07.5.2.B – Provide a general note stating “The total number of lots is 2.”

9. COMMENT: 2-07.5.2.C – Provide a general note stating “Total miles of new public streets are ____”, “Total miles of new private streets are ____.”

10. COMMENT: 2-07.5.2.H – Add the following note on all plats. The purpose of this note is solely for review for compliance with local and state laws governing subdivision and land splits. “There will be no further division of lots without the expressed approval of the City of Tucson.”

Addition comments:
11. Remove the “LOT COVERGE CALCULATION” from the final plat.

12. On the required supplemental plot plan provide a setback dimension from the carport shown on parcel ‘B’ to the proposed property line to the east. Also provide the height of this carport on the plan. Minimum setback is 6’ or 2/3 the height of the exterior wall, greater of the two measurements.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter.
If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED
CDRC Review Coordinator Express REVIEW COMPLETED Review request email sent per Assessors & TEP. FYI email sent to PAG, USPS, SWG.
External Reviewers - Pima Association of Governments REVIEW COMPLETED FYI email sent to PAG, USPS, SWG.
External Reviewers - Southwest Gas REVIEW COMPLETED FYI email sent to PAG, USPS, SWG.
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED FYI email sent to PAG, USPS, SWG.
Fire New Construction REVIEW COMPLETED
Historic REVIEW COMPLETED It appears that the proposed lot line adjustment will not have any impact on the San Pedro City of Tucson Historic Landmark designation. If expansion of the Historic Landmark is considered, it will need to follow the steps noted in UDC 5.8.6.
NPPO REVIEW COMPLETED
OK to Submit - Engineering Fast REVIEW COMPLETED
OK to Submit - Zoning Fast REVIEW COMPLETED