Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TD-DIV-0523-00060
Parcel: 141356180

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-0523-00060
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Building APPROVED
External Reviewers - Tucson Electric Power (TEP) APPROVED TEP-DEVREV <TEPDEVREV@tep.com> Fri 6/30/2023 7:11AM
CDRC;Design Admins <DesignAdmins@tep.com>
Jason Morse <jmorse@greniereng.com>
Greetings,
Tucson Electric Power Co. (TEP) has reviewed and has no objection to La Vida at Civano (Lots 1-27, Common Areas A, B & C). There are existing TEP facilities within the boundaries of the plat. Costs for removing or relocating existing TEP facilities will be billable to the developer.
Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument.
Respectfully,
Tucson Electric Power Co.
Land Resources Department
New Services/JOC APPROVED TD-DIV-0523-00060 - Land Division_Subdivison v1 – 5695 S NIGHTBLOOM WY

1. Tucson Water has no objections to the proposed final plat.
2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
NPPO APPROVED
Traffic Engineering Review APPROVED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
Entitlements NOT REQUIRED completed
Residential Building NOT REQUIRED
CDRC Post Review PENDING ASSIGNMENT
Final Plat Package PENDING ASSIGNMENT
Commercial Plumbing REQUIRES RESUBMIT Show how the individual lots will be supplied with water.
External Reviewers - Pima County Addressing REQUIRES RESUBMIT Good morning,
Pima County Addressing is returning TD-DIV-0523-00060 Final Plat for La Vida at Civano Lots 1-27 for corrections. Please see the attached plan for comments.

Nicholas Jordan
Site Review Project Manager - Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-9623
Site Engineering REQUIRES RESUBMIT Assurance Agreement:
1. Remove the body text and footnote of exhibit C in the Assurance Agreement, this will be filled by the Clerk's office.
2. Fill in the Subdivision Case No. TD-DIV-0523-00060 in Exhibit B and in the footnotes

Amendment to Trust:
1. Fill in the Subdivision Case No. TD-DIV-0523-00060 in the footnotes
2. Remove the blank page 4, and remove the page number from exhibit A
3. Ensure the most current form is used, the 9/7/2017 form is outdated

Plat:
1. Fill in the Subdivision Case No. TD-DIV-0523-00060 in the title block
2. Include a reference to the approved tentative plat DP21-0234 near the title block

Scott Haseman
scott.haseman@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: La Vida at Civano
FINAL PLAT (1st Review)
TD-DIV-0523-00060

TRANSMITTAL DATE: May 26, 2023

DUE DATE: June 10, 2023

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.

2-07.5.0 CONTENT REQUIREMENTS

2-07.5.1 General

1. COMMENT: 2-07.5.1.H - The subdivision case number, TD-DIV-0523-00060, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & detailed response letter.
If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov.
CDRC Application Completeness REVIEW COMPLETED
CDRC Review Coordinator REVIEW COMPLETED
External Reviewers - COT Parks & Recreation REVIEW COMPLETED Hello CDRC team,
On behalf of the City of Tucson Parks and Recreation Department, I have no comments on the above development plan.

Tom Fisher
Project Manager
City of Tucson Parks and Recreation Department
900 S. Randolph Way
Tucson, Arizona 85716
(520) 837-8037
External Reviewers - Pima Association of Governments REVIEW COMPLETED Sent FYI email per SOP
External Reviewers - Pima County Assessor REVIEW COMPLETED Good afternoon,
See attached per your request.
Please contact me if you have any questions.
Thank you
External Reviewers - Pima County Wastewater (RWRD) REVIEW COMPLETED The applicant is responsible for obtaining review and approval by Pima County for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems. The applicant must provide an Approval letter from RWRD prior to PDSD finalizing your permit. A condition will be added to the permit and will not be removed until this request has been satisfied.
External Reviewers - Southwest Gas REVIEW COMPLETED Sent FYI email per SOP
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED Sent FYI email per SOP
Fire New Construction REVIEW COMPLETED
OK to Submit - Engineering REVIEW COMPLETED
OK to Submit - Zoning REVIEW COMPLETED