Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/SUBDIVISION v.3
Plan Number - TD-DIV-0425-00056
Review Name: LAND DIVISION/SUBDIVISION v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| Commercial Plumbing Standard | REQUIRES RESUBMIT | A positive Type II Capacity Response is not, “…an approval of point and method of connection.” Show how connection will be made to the public sewer. [Initial comment: The public sewer located in Prince Road is 27” in diameter and it doesn’t appear that here are any existing sewer connections in the vicinity of the lot being split. Contact Gerry Koziol (gerry.koziol@pima.gov) to determine possible ways that you might connect to the public sewer.] | |||
| Entitlements Standard | REQUIRES RESUBMIT | Please address site zoning comments. | |||
| Site Engineering Standard | REQUIRES RESUBMIT | 1. See that zoning comments are addressed. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
|||
| Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Prince Casitas Lots 1 & 2 Final Plat (2nd Review) TD-DIV-0425-00056 TRANSMITTAL DATE: August 12, 2025 DUE DATE: August 13, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. Additional Comments: Tentative Plat Comments: 1. COMMENT: Provide a copy of the required supplemental site plan, tentative plat, with the next submittal. 2. Until the DDO is approved Zoning cannot approve this plat. It does not appear that the DDO was submitted correctly. Contact Georgia Pennington to ensure you submit correctly. COMMENT: Per UDC Table 6.3-4.A C-2 zone, Res Use to Nonres Zone the required perimeter yard setback is 10’ or ¾(H), (H) = Height of the proposed exterior building wall. As no wall heights were provided zoning cannot verify required perimeter yard setbacks but based on the 6.1’ setback shown from the single story to the new west property line does not meet the minimum 10’-0”. A Design Development Option (DDO) must be submitted and approved to reduce the required setback prior to approval of this plat. DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. If you have questions about the DDO application or process please contact Georgia Pennington at Georgia.Pennington@tucsonaz.gov”. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED | ||||
| External Reviewers - Pima County Assessor Standard | REVIEW COMPLETED | Office of the Pima County Assessor 240 N. Stone Ave. Tucson, Arizona 85701 SUZANNE DROUBIE PIMA COUNTY ASSESSOR TO: City of Tucson Development Services FROM: Michael Bell GIS Technician Pima County Assessor’s Office Michael.Bell@pima.gov (520)724-7503 DATE: August 21, 2025 RE: Assessor’s Review and Comments Regarding: TD-DIV-0425-00056 – Prince Casitas * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. ___ __ Plat does not meet Assessor’s Office requirements. COMMENTS: NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. AUTOCAD DWGS CAN BE SENT TO THE EMAIL ABOVE. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
|||
| External Reviewers - Pima County Wastewater (RWRD) Standard | REVIEW COMPLETED | The applicant is responsible for obtaining review and approval by Pima County, for projects involving RWRD sewers, on-site wastewater treatment facilities and public water systems https://www.pima.gov/1766/Wastewater-Reclamation. The applicant must provide an Approval letter from RWRD, prior to PDSD Approving the permit. | |||
| New Services/JOC Standard | REVIEW COMPLETED | Tucson Water has no objection to the proposed subdivisions as long as each lot has its water meter located at the front of the lot. If either of the two subdivisions encounters difficulties in placing the water meter at the front of the lot, a new water meter must be requested and installed at the front of the lot prior to the subdivision. |