Plan Number: TD-DIV-0425-00047
Parcel: 115180220

Address:
1475 N ORACLE RD

Review Status: Requires Resubmit

Review Details: LAND DIVISION/LOT SPLIT v.3

Plan Number - TD-DIV-0425-00047
Review Name: LAND DIVISION/LOT SPLIT v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Record Documents Express REQUIRES RESUBMIT Here are your next steps to finalize the project:
1. Submit a copy of the approved and stamped drawings as well as the warranty deeds for the land to be divided (you can get the warranty deeds from your title company) to the Pima County Recorder's office to record. You should receive a receipt for the recordation and your warranty deeds will be stamped.
2. Submit a copy of the warranty deeds to Pima County Addressing so that the office can ensure the property addresses and parcel numbers are correct. You should receive a receipt or document showing the new or existing addresses on new parcels.
3. Submit the following documents for your land division into the TDC Online portal:
A. Warranty Deeds with affixed label showing date it was recorded and the Sequence number
B. Receipt or document (from Addressing) showing the new address(es)
Here are your next steps to finalize the project:
1. Submit a copy of the approved and stamped drawings as well as the warranty deeds for the land to be divided (you can get the warranty deeds from your title company) to the Pima County Recorder's office to record. You should receive a receipt for the recordation and your warranty deeds will be stamped.
2. Submit a copy of the warranty deeds to Pima County Addressing so that the office can ensure the property addresses and parcel numbers are correct. You should receive a receipt or document showing the new or existing addresses on new parcels.
3. Submit the following documents for your land division into the TDC Online portal:
A. Warranty Deeds with affixed label showing date it was recorded and the Sequence number
B. Receipt or document (from Addressing) showing the new address(es)
CDRC Application Completeness Express REVIEW COMPLETED
Commercial Building Fast REVIEW COMPLETED APPLICANT RESPONSE
Comment 1 – Acknowledged. South and West: there is a 20’ separation from the
Tucson House building to the Annex Building and the new property line is
right on the annex wall. Per project Architect and per Table 602:
 Tucson House at 20’ separation, Group R, Type 1 Construction, a
1-hour rating is required. The existing wall is concrete with
masonry veneer which exceeds the 1-hour rating.
Both buildings are sprinklered, so there is no limit to the quantity of
openings on either wall facing the other building and no physical changes
required.

Comment 2 – Acknowledged. The northwest corner: the Annex Building at the new
property line is right on the annex wall. Per project Architect and per
Table 602:
 The Annex Building with zero separation, Group B, Type VB
Construction, a 1-hour rating is required. The existing wall is 8”
concrete masonry with masonry veneer which exceeds the 1-hour
rating.