Plan Review Detail
Review Status: Requires Resubmit
Review Details: LAND DIVISION/LOT SPLIT v.1
Plan Number - TD-DIV-0323-00053
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Site Engineering | APPLICATION INCOMPLETE | The parcel cannot be divided into four new parcels through a lot split. Because of its history, the site must be subdivided. Please apply for a new land division under the Subdivision/Plat application type and reach out to CDRC@tucsonaz.gov and request to have this permit voided. Lianne Evans lianne.evans@tucsonaz.gov |
|||
| Site Zoning | APPLICATION INCOMPLETE | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 3737 N Stone Av. – R-2 TD-DIV-0323-00053 Land Split (1st Review) TRANSMITTAL DATE: March 27, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. SECTION 2-08.0.0: LAND SPLIT 2-08.2.0 CONTENT REQUIREMENTS 1. COMMENT: 2-08.2.0 – Based on the existing legal description of parcel 106-02-201B “PASTIME ACRES RESUB LOT 3C & S2 LOT 3B EXC E5.4'” the existing parcel was split off of another parcel which was created via a platting process. The proposed land splits exceeds the number of allowed splits for a property whose boundaries are fixed by a recorded plat which is divided into two or more parts, see UDC Article 11.4.20 definition of a Subdivision, C. A minor subdivision meeting AM 2-07 is required to be submitted and approved. 2. COMMENT: 2-08.5.E – Provide a supplemental Residential Plot Plan that meets the requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf, The plot plan shall show all structures that are on this site along with perimeter yard setbacks to the proposed property line and a lot coverage calculation. Required perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A). If any of the proposed setbacks to not meet the minimum additional comments maybe forth coming. If you have any questions about this transmittal, please contact Nicholas Martell at Nocholas.Martell@tucsonaz.gov. |
|||
| Commercial Plumbing | APPROVED | ||||
| Record Documents Express | PENDING ASSIGNMENT | ||||
| Residential Building | REQUIRES RESUBMIT | The existing building requires demolition for the proposed property line. Notate the demo and provide an application for demolition. | |||
| TW New Development Review | REQUIRES RESUBMIT | TD-DIV-0323-00053 - Land Division_Land Split_Lot Split v1 – 3737 N STONE AV 1. Sheet 1: The legal description in the title block in the lower right hand corner of Sheet 1 does not match the legal description of the property being subdivided along the right hand side of the page. Revise as necessary. 2. Sheet 1: The location of the property being subdivided in the title block in the lower right hand corner of Sheet 1 does not match the location shown in the location map on Sheet 1. Revise as necessary. 3. Sheet 1: The number of lots shown in the title block in the lower right hand corner of Sheet 1 does not match the number of lots indicated in General Note 2 on Sheet 1, or the number of lots shown on Sheet 2. Revise as necessary. 4. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
|||
| CDRC Application Completeness Express | REVIEW COMPLETED |