Review Status: Requires Resubmit

Review Details: LAND DIVISION/LOT SPLIT v.1

Plan Number - TD-DIV-0124-00003
Review Name: LAND DIVISION/LOT SPLIT v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Commercial Plumbing APPROVED
Residential Building APPROVED
TW New Development Review APPROVED TD-DIV-0124-00003 - Land Division_Land Split_Lot Split v1 – 5804 E FAIRMOUNT ST

1. Tucson Water has no objections to the proposed Land Split / Lot Split.

2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Commercial Building NOT REQUIRED Not commercial, see Residential Building comment.
Record Documents Express PENDING ASSIGNMENT
Site Engineering REQUIRES RESUBMIT 1. The original parcel (lot 6, bkl 8 of mountain acre farms) has already been split into three parcels, anymore divisions will require a new subdivision be platted. This can not be a done as a lot split.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: 5804 E FAIRMOUNT ST. – R-1
TD-DIV-0124-00003
Land Split (1st Review)

TRANSMITTAL DATE: January 17, 2024

SECTION 2-08.0.0: LAND SPLIT

2-08.5.0 CONTENT REQUIREMENTS

The drawing showing the proposed land split shall include the following:

1. 2-08.5.F - COMMENT: Perimeter yard setbacks are based on a wall height measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. In this case it will be the measurement from design grade to the top of parapet. Provide the east wall height so that the required perimeter yard setback can be determined. R-1 Zone the required perimeter yard setback from the east wall of the duplex to the east property line is 6’-0” or 2/3 (H) height of the exterior wall. The proposed 5’-0” will require a Design Development Option ( will be required. DDO application and requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. If you have questions about the DDO application or process please contact Wyatt Berger at Wyatt.Berger@tucsonaz.gov or Georgia Pennington at Georgia.Pennington@tucsonaz.gov.

2. 2-08.5.F - COMMENT: Provide a lot coverage calculation for parcel 1 that meets the requirements of UDC Article 6.4.3 and the example shown on the Residential Plot Plan Requirements found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example.

3. 2-08.5.F - COMMENT: Per UDC Table 4.8-2 & Table 6.3-2.A the minimum lot size for an R-1 lot with two (2) dwelling units is 10,000 sq. ft. A rezoning maybe required or possibly a Board of Adjustment for Variance will be required. Board of Adjustment application/requirements can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration. Contact for the Board of Adjustment is Mark Castro at Mark.Castro@tucsonaz.gov.

If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov.
CDRC Application Completeness Express REVIEW COMPLETED