Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: LAND DIVISION/SUBDIVISION v.1

Plan Number - TD-DIV-0123-00035
Review Name: LAND DIVISION/SUBDIVISION v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
Site Engineering APPROVED
Site Landscape APPROVED
Commercial Plumbing NOT REQUIRED
Commercial Structural NOT REQUIRED
External Reviewers - Southwest Gas NOT REQUIRED
External Reviewers - Tucson Electric Power (TEP) NOT REQUIRED
External Reviewers - United States Postal Service (USPS) NOT REQUIRED
NPPO NOT REQUIRED
OK to Submit - External Reviewer PC Addressing NOT REQUIRED
Residential Building NOT REQUIRED
CDRC Post Review PENDING ASSIGNMENT
Final Plat Package PENDING ASSIGNMENT
External Reviewers - Pima County Assessor REQUIRES RESUBMIT TO: City of Tucson Development Services
FROM: Karl Christensen
GIS Cartographer
Pima County Assessor’s Office
(520)724-3125

DATE: February 8, 2023

RE: Assessor’s Review and Comments Regarding: (SUBMITTAL 1)
TD-DIV-0123-00035 – BRIDGES TUCSON MARKETPLACE LOT 6
REPLAT - FINAL PLAT



* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Plat meets Assessor’s Office requirements.
__X___ Plat does not meet Assessor’s Office requirements.
COMMENTS:
• There must be a section tie, with a bearing and dimension from the
section corner or quarter corner to the point of tie on the subdivision.
• While it is recognized and appreciated that information concerning the
numbering of Lots and their respective square footages is present in the
General Notes, please include the number of Lots in the lower-right
Title Block (ie: “Lots 1-3”), and please include Lot square footages
below the Lot numbers in the plat map on Sheet 2.
• It would be appreciated if a Detail was provided for the small, crowded
area near the South West corner of Lot 3 / South East corner of Lot 2.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
New Services/JOC REQUIRES RESUBMIT 1. The proposed final plat does not show the 15’ wide water easements on the property (existing Lot 6) created by Docket 13877, Page 2178 (Seq. No. 20101610455) and Docket 13877, Page 2171 (Seq. No. 20101610454).
2. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Site Zoning REQUIRES RESUBMIT Comment
CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Bridges Tucson Marketplace – Lot 6 Replat
FINAL PLAT (1st Review)
TD-DEV-1122-00014

TRANSMITTAL DATE: December 15, 2022

DUE DATE: December 07, 2022

The Zoning Review Section conditionally approves the final for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.5.0 CONTENT REQUIREMENTS
1. COMMENT: 2-07.5.1.H – Provide subdivision case number, TD-DIV-0123-00035, assigned to this plat in the lower right corner of the plat next to the title block on all sheets.
If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
CDRC Application Completeness REVIEW COMPLETED
CDRC Review Coordinator REVIEW COMPLETED
External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED EXTERNAL] Re: Fw: Review Request for COT - Planning and Development Services

Jay Gomes <jgomes@azdot.gov>
CDRC
Douglas Moseke <dmoseke@azdot.gov>
Good Afternoon,

Thank you for the follow-up.

The Frontage Road is owned, operated, and maintained by the Arizona Department of Transportation.

Any new/revised/redeveloped access point to the Frontage Road will require an ADOT Encroachment Permit.

The approval of Traffic Impact Analysis or Statement is typically required to obtain the Permit.
It is highly recommended that the Developer/Owner contact the Department to schedule a Development meeting to discuss items related to these processes.

Additional information can be found on our website, see below.
https://azdot.gov/business/permits/encroachment-permits
https://azdot.gov/sites/default/files/media/2021/08/TGP0240-2021-08.pdf

Should you have any questions or concerns regarding this item, please feel free to contact me.
External Reviewers - COT Parks & Recreation REVIEW COMPLETED TD-DEV-1122-00014 Minor Plat
NOW TD-DIV-0123-00035

Retention: 90 Day Delete (3 months) Expires: Mon 4/3/2023 4:19 PM
Retention: 90 Day Delete (3 months) Expires: Mon 4/3/2023 4:19 PM
Tom Fisher
CDRC
Iliana Gonzales
Hello CDRC team,

On behalf of COT Parks and Recreation Department, I have no comments on the above development project as it does not impact any parks. Please let me know if you have any questions.

Tom Fisher
Project Manager
City of Tucson Parks and Recreation Department
900 S. Randolph Way
Tucson, Arizona 85716
(520) 837-8037
Fire New Construction REVIEW COMPLETED
OK to Submit - Engineering REVIEW COMPLETED
OK to Submit - Zoning REVIEW COMPLETED
ROW Engineering Review REVIEW COMPLETED No Comments
Traffic Engineering Review REVIEW COMPLETED No Comments