Permit Number: TD-DEV-1225-00316
Parcel: 118061140

Address:
1901 W KING AV

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-1225-00316
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/25/2026 NPPO Standard APPROVED
09/15/2026 Commercial Plumbing Standard REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-1225-00316
ADDRESS/PARCEL: 1901 W KING AV TUCSON, AZ 85713

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:

1. Please provide cleanouts in the building sewer prior to entering the right-of-way. Reference: Pima County Standard Detail RWRD 401, 2021.
2. The building sewer cleanouts are still difficult to identify on the plans. Please clearly label the cleanouts. Additionally, the building sewer is shown differently on Sheet SD-6. Please clarify whether the sewer shown on Sheet SD-6 is the existing building sewer and whether a new building sewer is being installed for the building expansion. Reference: Section 107.2.1, IBC 2024.
3. Specify the material of construction for the building sewer. Reference: Section 702.3, IPC 2024.
4. The manhole shown on the plans (MH 9881-31) appears to be a cleanout. Please show the RIM elevation of the nearest upstream manhole (MH 9881-62) on the plans to determine whether a backwater valve is required. Reference: Section 714.1, IPC 2024, as amended by the City of Tucson.
09/15/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-1225-00316 (V.2)
Project: Site Updates & Building Additions
Location: 1901 W KING AV
Review Date: 9/15/2026
Reviewer: Dylan Molina – Engineering Associate - Site Engineering
Reviewer Contact: Dylan.Molina@tucsonaz.gov

Plan review for the above referenced activity number has been completed. This letter reflects comments to address to ensure approval from Site Engineering.
To facilitate timely reviews, please include a response letter, updated plans and any additional supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. DO NOT mark or highlight changes in the drawings at this stage — reserve revision markups for after issuance. Please provide response letter and updated plan set as separate files.

Site Engineering Review Comments:
1. Sheet 1 – Sheet Index and Sheet Labels: Provide the page number and total number of pages within the Development Package plan set (i.e., sheet xx of 9) on the bottom right corner of each page. Currently, the cover page shows “SHEET 1 OF 7” and subsequent sheets show, “_ of _”. All sheets must be updated to have “xx of 9” and the Sheet Index must include the two missing pages. [AM 2-06.4.2.D].
2. Sheet 1 – Expansion Calculation: 1504 SF/3026 SF does not equal 38% expansion. Revise to accurate percentage.
3. Missing Communication per previous comment, “7. It should be noted that - Use of APCs for multi-family, commercial, or industrial development requires prior approval from Environmental Services. TSM 8-01.4.G The person of contact shall be Andy Vera at Andy.Vera@tucsonaz.gov a. Until Approval is provided, it will be required that a trash enclosure detail in compliance with TSM 8-01.5.0 be provided for construction.” For next submittal, include approval for APC use by Andy Vera.
(a) Additional details are needed for APCs: please indicate where APCs (one for recycling and one for waste) will be stored, and that pedestrian circulation is provided to storage location.
(b) Update the Waste Stream Calculation to include both APCs, one for recycling and one for waste.
4. Sheets 3, 4 & 5 - Missing pedestrian circulation: Existing 926 SF Church Office must include pedestrian circulation to the Northwest Entrance and to the rear of the building to connect access from the ROW and provide a minimum separation from the PAAL. Update and dimension plan showing pedestrian pathways with minimum 48-inch unobstructed clear width and physical separation as required. [TSM Section 7-01.4]
5. Sheet 2 – Provide Clarity about proposed fence: the proposed fence and the neighboring lot do not appear to function separately. What is the justification for not connecting to the neighboring parcel?
6. Drainage Report – Erosion Hazard Setback: An Erosion Hazard Setback (EHS) analysis is incomplete in the submitted drainage report. In accordance with City of Tucson Drainage Manual Chapter VII, Section 7.6 (Setbacks), an EHS analysis is required for the watercourse channels adjacent to the property. The EHS analysis shall be provided as a dedicated section within the drainage report and must include:
(a) the specific equation(s) used to compute setback distances per Section 7.6.1;
(b) clarity on the setback calculation methodology for the curved section of San Juan Wash; and
(c) the resulting setback distance(s) demonstrated on the grading plan. The analysis must specifically address the conditions of Section 7.6 (Setbacks) applicable to this curved watercourse reach. [City of Tucson Drainage Manual, Chapter VII, Sections 7.6–7.6.5]
09/25/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: WESTSIDE CHURCH OF GOD
ACTIVITY NO: TD-DEV-1225-00316
ADDRESS: 1901 W KING AV
ZONING: R-1 RESIDENCE ZONE
LAND USE: RELIGIOUS/REVIEWED AS ALL OTHER USES PER UDC TABLE 7.6.4-1 FOR LANDSCAPE BORDERS
REVIEW NO: 2
9.14.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS PER THE CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM) FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING.

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. The scientific/botanical name for Sweet Acacia is incorrect. Correct the name and the planting plan will be approved.

2. It appears that two Bird of Paradise are within the SVT at the centrally located street landscape border. Adjust the locations to be outside of the SVT as they get too large to be within the SVT.

Thank you.

CHAD KELLER, PLA
LANDSCAPE ARCHITECT

CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
09/22/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

REVIEWED BY: Jeffrey Cassidy – Planner
PDSD Zoning Review Section

PROJECT: Westside Church of God Development Package
Development Package (2nd Review)
TD-DEV-1225-00316 1901 W KING AV TUCSON, AZ 85713 R-1 ZONING

TRANSMITTAL DATE: September 22, 2026

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year expiration date is December 31, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.3.0 FORMAT REQUIREMENTS

1. COMMENT: The sheet index states there are seven sheets but nine are included. Additionally, there is inconsistency between the sheet titles, sheet codes and sheet numbers on the actual sheets and the sheet index. Update all accordingly. (AM 2-06.3.5).

2. COMMENT: The project location map incorrectly has Grant Rd where W Starr Pass should be located. Additionally, draw and label S Camino Santiago. (AM 2-06.4.1.A.3).

3. COMMENT: On sheet 3, there appears to be a fence graphic along the east property line and this appears to be proposed as nothing was observed from aerial/street imagery. This graphic is not located in the legend and/or keynotes as to what it is, etc. Clarify if the intent is to physically separate the parcels 118-06-1140 and 118-06-116F. Update accordingly. (AM 2-06.4.1.A.5).

4. COMMENT: Nine sheets provided. Provide the sheet xx of 9 on each sheet. (AM 2-06.4.1.B.5).

5. COMMENT: Per TP-PRE-0425-00078 and the first zoning reviewers review comments, parcels118-06-1140 and 118-06-116F are clearly functioning as one site and literally connected by a sidewalk (contrary to the consultants comment response comment indicating otherwise). Include parcel118-06-116F in the gross area of the site. (AM 2-06.4.2.C).

6. COMMENT: Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.2 Environmental Resource Zone (HDZ)”. (AM 2-06.4.2.F).

7. COMMENT: Include the square footage of the Westside Church of God building on parcel 118-06-116F. (AM 2-06.4.2.H).

8. COMMENT: Provide the percentage of building, lot area, or vehicular use area expansion, including previous expansions. When the proposed site is part of a larger site, the calculations encompass the entire site, whether existing or proposed. Again, this for both parcels as both are viewed as one site. (AM 2-06.4.2.I).

9. COMMENT: Update the parking numbers to account for both parcels and their respective building square footages and uses. It appears the required overall vehicular parking may fall short, substantially.

For parcel 118-06-1140 submit for a Parking Design Modification Request or PDMR as 29 are required, 28 are listed with 26 depicted on the site plan. Parking Design Modification Request (PDMR)
https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5769
https://beta.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/modification_request_application_for_parking_design_pdmr_or_technical_standard_tsmr.pdf

Contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov and/or Stephen Blood at Stephen.Blood@tucsonaz.gov for more information.

For parcel 118-06-116F submit for a Individual parking Plan, or IPP, as 15 are required with 4 depicted on a 2026 aerial. This project is located within 400’ of an R-3 or more restrictive zone or Historic Preservation Zone and is subject to the 400’ Notice Procedure (UDC Section 3.3.5). A neighborhood meeting is required prior to submittal of an application. The IPP Narrative, sealed by a design professional licensed by the State of Arizona, must include the information as outlined in UDC Section 7.4.5.A.4.a – m https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5452 .

The IPP process should not start until after the development package has been reviewed and zoning has issued comments confirming a deficiency in on-site parking for the project.

For more information, refer to https://www.tucsonaz.gov/Departments/Planning-Development-Services/Planning-Zoning-Applications/Zoning-Administration and https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/planning-amp-zoning/individual_parking_plan_handout.pdf . Contact Mark.Castro@tucsonaz.gov. (AM 2-06.4.2.J).

10. COMMENT: Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system for parcel 118-06-116F (AM 2-06.4.7.A).

11. COMMENT: Provide the height of the building on parcel 118-06-116F (AM 2-06.4.7.H).

12. COMMENT: Even though this project is on its own parcel, it is recognized as a single site with parcels 118-06-1140 and 118-06-116F due to the shared access and these parcels functioning as a unified site, please submit a recorded Covenant Regarding Development and Use of Real Property with your next submittal. The

Covenant can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/submission-documents/covenant-regarding-development-and-use-of-real-property-udc-with-release.pdf. (AM 2-06.4.7.I).

13. COMMENT: Additional comments may be forthcoming on the next review based on responses to Zoning and other PDSD reviewer comments.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Please resubmit revised drawings and any corrected plans along with a detailed response letter, stating how all Site Zoning Review comments were addressed.

**Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.

***For additional information on the standards presented in this memo, please refer to the City of Tucson Administrative Manual Section 2-06 or Technical Standards noted in the comments.

If you have any questions about this transmittal, please contact Jeffrey.cassidy@tucsonaz.gov