Permit Number: TD-DEV-1225-00312
Parcel: 103192250

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-1225-00312
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/05/2026 NPPO Standard APPROVED
02/05/2026 Site Zoning Standard APPROVED
02/05/2026 Site Landscape Standard NOT REQUIRED
01/15/2026 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-1225-00312
Location: 2869 W BLACK CLOUD CT – Lot 12 – Tentative Plat: S06-050 – Hillside Grading
Review Date: 1/13/2026

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Comments:
1. In accordance with the final plat for Las Nubes, general note #9, a floodplain use permit will be required for submission for associated development package. a floodplain use permit will be required to be submitted and approved prior to Site Engineering approving permit TD-DEV-1225-00312. The FPU permit is a separate permit that can be submitted for within the “sub-records” tab of this development package permit on TDC online. For the FPU permit submission, provide all construction documents similar to what was provide within this permit submission. Note: The building permit will require it own FPU permit as well – thus two FPU permit will be submitted for development.
2. In accordance with the tentative plat for Las Nubes General note #18, provide a call-out for the required temporary fencing to protect the NUOS.
3. Revise the Average Cross Slope (ACS) calculations to follow the City of Tucson standard found in TSM 9-01.3.0.
4. In accordance with the final plat for Las Nubes, Provide the Q100 rates that Lot 12 has been found to be subject from the West property boundary.
5. A general note must be added to the plan stating this lot is subject to Hillside Development standard compliance.
6. The north and west property boundary dimensions do not match what is found from the final plat, please revise accordingly to match.
7. Delineate and call-out the 10x10 Electric easement established by the final plat on the southeast corner of the property.

It should be noted that additional Site Engineering comments may be forthcoming in future review cycles as provided comments and development changes may bring forth further callouts.

If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
01/12/2026 CDRC Application Completeness Express REVIEW COMPLETED
01/15/2026 CDRC Review Coordinator Express REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/03/2026 Commercial Plumbing Standard REVIEW COMPLETED
01/15/2026 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/15/2026 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/15/2026 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
02/04/2026 Fire New Construction Standard REVIEW COMPLETED
01/13/2026 OK to Submit - Engineering Fast REVIEW COMPLETED
01/14/2026 OK to Submit - Zoning Fast REVIEW COMPLETED
01/28/2026 ROW Engineering Review Standard REVIEW COMPLETED Roadways are Private.