Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-1225-00312
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/05/2026 | NPPO Standard | APPROVED | |||
| 02/05/2026 | Site Zoning Standard | APPROVED | |||
| 02/05/2026 | Site Landscape Standard | NOT REQUIRED | |||
| 01/15/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TD-DEV-1225-00312 Location: 2869 W BLACK CLOUD CT – Lot 12 – Tentative Plat: S06-050 – Hillside Grading Review Date: 1/13/2026 Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Comments: 1. In accordance with the final plat for Las Nubes, general note #9, a floodplain use permit will be required for submission for associated development package. a floodplain use permit will be required to be submitted and approved prior to Site Engineering approving permit TD-DEV-1225-00312. The FPU permit is a separate permit that can be submitted for within the “sub-records” tab of this development package permit on TDC online. For the FPU permit submission, provide all construction documents similar to what was provide within this permit submission. Note: The building permit will require it own FPU permit as well – thus two FPU permit will be submitted for development. 2. In accordance with the tentative plat for Las Nubes General note #18, provide a call-out for the required temporary fencing to protect the NUOS. 3. Revise the Average Cross Slope (ACS) calculations to follow the City of Tucson standard found in TSM 9-01.3.0. 4. In accordance with the final plat for Las Nubes, Provide the Q100 rates that Lot 12 has been found to be subject from the West property boundary. 5. A general note must be added to the plan stating this lot is subject to Hillside Development standard compliance. 6. The north and west property boundary dimensions do not match what is found from the final plat, please revise accordingly to match. 7. Delineate and call-out the 10x10 Electric easement established by the final plat on the southeast corner of the property. It should be noted that additional Site Engineering comments may be forthcoming in future review cycles as provided comments and development changes may bring forth further callouts. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 01/12/2026 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 01/15/2026 | CDRC Review Coordinator Express | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 02/03/2026 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 01/15/2026 | External Reviewers - Pima Association of Governments Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 01/15/2026 | External Reviewers - Southwest Gas Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 01/15/2026 | External Reviewers - United States Postal Service (USPS) Standard | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
| 02/04/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 01/13/2026 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 01/14/2026 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 01/28/2026 | ROW Engineering Review Standard | REVIEW COMPLETED | Roadways are Private. |