Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-1225-00306
Parcel: 12212048B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1225-00306
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2026 NPPO Standard APPROVED Approved. See site landscape comments.

Thank you.
Chad Keller, RLA
chad.keller@tucsonaz.gov
01/12/2026 Site Landscape Standard APPROVED PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW REPAIR SHOP PROPOSED TO BE BUILT ON THE NORTHEAST CORNER OF THE PARCEL TO REPLACE EXISTING PARKING SPACES
ACTIVITY NO: TD-DEV-1225-00306
ADDRESS: 4333 E SPEEDWAY BL

SITE LANDSCAPE/NPPO COMMENTS:

1. A site landscape plan set and native plant preservation plan were previously approved and implemented on site as part of the overall site plan under activity number DP17-0285. This expansion does not trigger additional site landscape requirements. State on the site plan that all site landscape was approved on the above mentioned DP.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
01/09/2026 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
January 8, 2026
WO#T172114
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: ROYAL AUTOMOTIVE DEVELOPMENT PACKAGE #2665
TD-DEV-1225-00306
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 12/17/2025. There are existing facilities within the
development which are not depicted upon the plan. TEP OVERHEAD LINES LOCATED
WITHIN PROPERTY. PLEASE CONTACT DESIGN IF RELOCATION/REMOVALS
ARE REQUIRED. Further: TEP Easements not shown on development plan
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
01/07/2026 Fire New Construction Standard REQUIRES RESUBMIT Provide Knox access at the existing gate or install a new hydrant to meet the requirements of IFC 24, 507.5.1.
Questions: patricia.shelton@tucsonaz.gov
12/17/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-1225-00306
Location: 4333 E SPEEDWAY BL
Review Date: 12/17/2025

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Comments:
1. Provide the development package case number, TD-DEV-1225-00306, adjacent to the title block on all sheets.
Solid waste collection and disposal comments:
2. Provide trash enclosure detail in compliance with TSM 8-01.5.0 This applies to the enclosure that is called out as being replaced on sheet #3
a. Revise the trash enclosure on grading plan to show the ramps slope being 2% away from enclosure as well as the enclosure slab sloping 1% to the gate. TSM 8-1.0.0
2. Provide the Waste Stream Calculations for the entire site according to TSM 8-01.8.0
Pedestrian circulation Comments:
3. The pathway leading to the south to connect to building #1, based on ariel photos it appears not to be ramped as an accessible pathway to connect the new structure to the rest of the site. Provide clarification as well as a detail showing that this pathway is accessible. TSM 7-01.0.0
4. Provide clarification in regard to the “Preliminary” aspect shown throughout the plans. If this is intended as an actual development package submittal for construction, Remove all “Preliminary” references. Including the text over all registered stamps.
5. Provide total cut/fill quantities as well as total site acres of disturbance.

If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
01/15/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Krista Hansen – Lead Planner
PDSD Zoning Review Section

PROJECT: Royal/Speedway Dealership
Development Package (1st Review)
TD-DEV-1225-00306 (4333 E SPEEDWAY BL – C-2)

TRANSMITTAL DATE: 1/15/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 15, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)


CONTENT REQUIREMENTS

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-1225-00306, adjacent to the title block on each sheet.

2-06.4.7 - General Notes
2-06.4.7.A.8.c - Percentage of building, lot area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included; and,

2. COMMENT: 2-06.4.7.A.8.c – The total existing building area is 51,895 sq ft. Correct calculations under Project Expansion Calculations.

2-06.4.9 - Information on Proposed Development
2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications.

3. COMMENT: 2-06.4.9.F – On the site plan, indicate zoning classifications of adjacent parcels.


2-06.4.9.H - Proposed Traffic Circulation

2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.)

4. COMMENT: 2-06.4.9.J – Per Paving Plan I-64-55, the current ROW on Speedway Blvd is 100 ft. Speedway Blvd has a future MS&R ROW of 120 ft. Add information as noted in the standard above.

5. COMMENT: Clarify reference to “Preliminary Improvements” on plans. If the project is not being phased, remove all references to “Preliminary.”

6. COMMENT: Draw and dimension setbacks from new building #5 to all applicable property lines. Per UDC Table 6.3-4.A, in C-2, a nonresidential use adjacent to a residential zone requires a minimum setback of 1 ½ times the height of the adjacent building wall. Ensure setback is met along the west property line.


***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, contact Krista Hansen by email Krista.hansen@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
12/15/2025 CDRC Application Completeness Express REVIEW COMPLETED
12/17/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added: TEP, SWG, USPS, and PAG to the workflow. Review request email sent to TEP, and FYI email sent to, SWG USPS PAG.
01/08/2026 Commercial Plumbing Standard REVIEW COMPLETED
12/17/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/17/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/17/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/16/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
12/16/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
01/06/2026 ROW Engineering Review Standard REVIEW COMPLETED