Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-1225-00302
Parcel: 117073420

Address:
405 S 6TH AV

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1225-00302
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2026 NPPO Standard APPROVED
12/18/2025 Design Review Standard NOT REQUIRED Site is outside the Downtown Infill Incentive District (IID) and the Rio Nuevo Area (RNA).
N/A Real Estate Standard PENDING ASSIGNMENT
01/05/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Revise the Private Water and Backflow Assembly Notes (Sheet 2 of 19) to show conformance with the International Plumbing Code, not the Uniform Plumbing Code.
01/12/2026 External Reviewers - COT Environmental Services Standard REQUIRES RESUBMIT ES review comments are as follows:
1. Clarify what type of equipment/service is being proposed. Notes within the enclosure detail reference a compactor. Include waste calculations. TSM 8-01.4.B/8-01.8.0
2. Details sheet 13 of 19, Identifies two enclosure designs, enclosure detail E & F. Must include all dimensions and construction details to include enclosure gates. Refer to TSM 8-01.5.2 and 8-01.9.0 Figure 3A & 3B.
3. Identify paths for all buildings/users to designated trash/recycle storage area.

Feel free to contact me regarding my review comments.

Sincerely,
Andy Vera
(520) 837-3798
Andy.Vera@tucsonaz.gov
12/22/2025 Historic REQUIRES RESUBMIT This property is located within the Armory Park Historic Preservation Zone (HPZ). Full Historic Review is required.
SPECIAL DISTRICT SUB-RECORD: You must create a Special District (SD) Sub-Record in TDC Online for your Historic Review. For instructions on how to create a Sub-Record, see: https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/sub-records.pdf.
APPLICATION REQUIREMENTS: Historic Review requires a supplemental application. Please see the Historic & Special Districts Application Instructions for more information about submittal requirements: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/special_districts_application_instructions_3.3.2025.pdf. As part of your Design Package, please include the following: project description, site plan for the subject parcel (existing and proposed), floor plans (existing and proposed), roof plans (existing and proposed), elevations, window and door schedule, photographs of existing conditions, Development Zone map for subject parcel (as described in instructions) along with precedent photographs, product names/specifications/brochures, and Arizona SHPO Inventory Form. All materials required as part of your Design Package should be combined and uploaded to your Special District Sub-Record as a single PDF.
REVIEW PROCESS: Applications for projects that qualify for Full Historic Review will be reviewed by staff. Once the Design Package is deemed complete and fees are paid, staff will schedule a Full Review with representatives of the Armory Park Historic Zone Advisory Board followed by the Tucson-Pima County Historical Commission, Plans Review Subcommittee (PRS). Following board and commission review, comments will be forwarded to the PDSD Director, who makes the final decision. Conditions of approval are common and revisions to the Design Package will be required before final approval. Staff will generate a Notice of Decision and stamp the final approved Design Package. You can then resume the regular planning/building review process.
QUESTIONS: For questions or to set up a meeting with Historic staff, please contact: Michael.Taku@Tucsonaz.gov.
01/07/2026 ROW Engineering Review Standard REQUIRES RESUBMIT Remove cross walk markings from South of 14th st and 6th ave.
Sidewalk should be 6' on the driveway apron on 6th ave.
Trash Enclosures on Arizona ave should be angled. Place vertical curb on p/l.
12/12/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-1225-00302
Location: 415 S 6TH AV
Review Date: 12/12/2025

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Comments:
1. Provide the development package case number, TD-DEV-1225-00302, adjacent to the title block on all sheets.
2. Revise Sight visibility triangles, 6th AV is classified as a Collector Road. This would mean that the SVT would be 20’x265’ for the Near side, TSM 10-01.5.3
3. Revise site notes General note 9 to “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” Administrative manual 2-06.4.7.C.2
Solid waste collection and disposal comments:
4. Revise provided trash enclosure details on sheet 13 to show with compliance with TSM 8-01.5.0
5. Provide the Waste Stream Calculations for the entire site according to TSM 8-01.8.0
6. Add the general note “A single property owner, property management company, or homeowners’ association (HOA), will be responsible for the management and maintenance of the solid waste collection services and storage area(s) for all development/business occupants.” TSM 8-01.5.1.D
7. The required clearance is 14x40 feet with a required height clearance of 25ft. TSM 8-01.0.0. Please show this required space delineated for the trash enclosures. There appears to be power lines that run directly down on the West side of Arizona AV.
8. Revise the trash enclosure on grading plan to show the ramps slope being 2% away from enclosure as well as the enclosure slab sloping 1% to the gate. TSM 8-1.0.0

Parking:
9. It is required that the parking spaces have a minimum width of 10 feet when the side(s) of the parking space abuts a vertical barrier over six inches in height. UDC 7.4.6.D.b Demonstrate this for the ADA parking space on the South-east portion of the development on sheet 4.
10. This to review compliance with UDC 7.4.6.F.2 & UDC 7.4.6.E.2. It is required that the required the canopy either follow the required height clearance of 15 – feet or be setback one foot or greater from the drive through lane. Sheet 6 (Grading Plan) shows Keynote #14, provide height within description

Grading/Drainage:
11. Provide a keynote/callout for all buildings (Existing and Proposed) downspouts and sidewalk scuppers for the building to ensure that stormwater from roof drains, up to and including flow from the ten-year storm event, does not pass over sidewalks per Technical Standards Manual 7-01.4.3E. This should be called out on the grading plan.
12. Sheet 5 (Grading plan) shows building #2 FFE =2403.89 but sheet 3 (Site Plan) shows building #2 FFE = 2401.75. Revise accordingly to show consistency.
13. Sheet 6&7 (Grading plan) shows building #6 FFE =2402.33 but sheet 4 (Site Plan) shows building #6 FFE = 2402.48. Revise accordingly to show consistency.
14. As the drainage report shows the site experiences regulatory discharges, a floodplain use permit for work within a floodplain will be required for submission and approval in relation to the proposed site work.
15. The waiving of retention will be considered as the site shows predominantly D-Soil types. Unfortunately, detention will be remaining a requirement. It will be required that at minimum the sites discharge is at or below Pre-Development levels as required by Balanced basin requirements.
16. What is proposed to alleviate potential flooding that may occur in the underground garage during a 100-year storm event?
17. Provide a figure/exhibit that delineates the floodplain limits found along 14th St and 6th Ave within the Drainage report.

Marco Contreras
Engineering Associate – Site Engineering
Marco.contreras@tucsonaz.gov
01/09/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW MULTIFAMILY DEVELOPMENT
ACTIVITY NO: TD-DEV-1225-00302
ADDRESS: 415 S 6TH AV
ZONING: C-3 COMMERCIAL ZONE; HPZ HISTORIC PRESERVATION ZONE
LAND USE: MULTIFAMILY
01.09.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS PER THE CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM) FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING.

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL OF THE SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. This site is exempt from hitting the 50 percent water demand requirement for commercial rainwater harvesting, as this is an existing site with existing structures and many site constraints. Please add a general note to the rainwater harvesting plan that states the existing nature of the site and the effort that was made to achieve the 33 percent.

2. The grading plan does not include the contouring for the WHIA(s). Coordinate the plans so that all sheets include identical linework. Include matching spot elevations on the grading plan and the rainwater harvesting plan.

3. This project includes the addition of a commercial scale parking area within the project limits. Parking lot trees and water harvesting are required. The site plan includes 5-foot-wide planter islands for trees. If the site is too constrained to provide significant shade trees, then please add a note to the planting plan that explains this. At the very least shrubs/accents should be included on the planting plan. Rainwater harvesting is required in this area due to the number of parking spaces and the required landscape trees. Same comment for this area in regard to site constraints and adding a note to the water harvesting plan.

4. Provide the development package activity number on all site landscape sheets, TD-DEV-1225-00302.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
01/09/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
All Saints Site 3 Multifamily – 415 S. 6th Ave. Tucson, AZ 85701
Development Package (1st Review)
TD-DEV-1225-00302

TRANSMITTAL DATE: 1/9/2026
DUE DATE: 1/6/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 10, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-1225-00302 adjacent to the title block on each sheet and the associated Special District permit number once one is created.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

Zoning and Land Use Notes

2-06.4.7.A.1 - List as a general note: "Existing zoning is ____."

2. COMMENT: 2-06.4.7.A.1 – The “existing zoning” is HC-3 not H3 as listed on sheet 2. Please update as noted by the standard above.

2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

3. COMMENT: 2-06.4.7.A.4 – List all the uses as classified per the UDC and include all UDC sections applicable to the proposed uses. As this is a multifamily project, please list the use as multifamily not residential.

2-06.4.7.A.5 - On residential projects, list the total number of units/lots proposed.

4. COMMENT: 2-06.4.7.A.5 – Clearly list the total number of units under site notes as noted by the standard above.

2-06.4.7.A.6 - If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

5. COMMENT: 2-06.4.7.A.6 – Include a note stating “this project is designed to meet the overlay zone(s) criteria. UDC Article 5.4 Major Streets and Routes Setback Zone (MS&R)”.

2-06.4.7.A.6.a - List additional applications and overlays, by case number (if applicable), in lower right corner of each sheet. As a general note provide the type of application processed or overlays applicable, a statement that the project meets the criteria/conditions of the additional application or overlay, the case number, date of approval, what was approved, and the conditions of approval, if any.

6. COMMENT: 2-06.4.7.A.6.a – As this project requires historic review and approval, please include the Special District application number in the lower right corner of each sheet as noted by the standard above.

2-06.4.7.A.8 - For development package documents provide:

2-06.4.7.A.8.a - Floor area for each building;

7. COMMENT: 2-06.4.7.A.8.a – Please clearly label the floor area for each building as noted by the standard above. Sheet 2 clearly calls out building 2 but it combines the floor area for both building 5 & 6.

2-06.4.7.A.8.b - Percentage and area in square feet of building and accessory building coverage;

8. COMMENT: 2-06.4.7.A.8.b – Please include the information as noted by the standard above.

2-06.4.8 - Existing Site Conditions
The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

2-06.4.8.C - The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

9. COMMENT: 2-06.4.8.C – As both S. 6th Avenue and E. 14th Street are wider than 50 feet, please include the information across both streets as noted by the standard above.


2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements.

10. COMMENT: 2-06.4.9.A – As this site is made up of 7 parcels (117073420, 117073430, 117073440, 117073450, 117073410, 117073400, 117073390), a lot combination or a recorded covenant is required. Either provide the approved lot combination request form or a recorded Covenant Regarding Development and Use of Real Property with your next submittal. The Covenant can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/submission-documents/covenant-regarding-development-and-use-of-real-property-udc-with-release.pdf.

2-06.4.9.F - All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. If the property is being rezoned, use those boundaries and classifications. The basis for this requirement is that some zoning requirements on a project are based on the zoning classification of adjacent property. Also, in some instances, each zone has to be taken into consideration on property that is split by two or more zoning classifications, as each may have different requirements.

11. COMMENT: 2-06.4.9.F – Clearly label and define all zoning classifications on and adjacent to the project as noted by the standard above.

2-06.4.9.H.2 - Show future and existing sight visibility triangles. On a designated MS&R street, the sight visibility triangles are based on the MS&R cross-section.

12. COMMENT: 2-06.4.9.H.2 – See Site Engineering comments as it relates to the Sight Visibility Triangles.

2-06.4.9.H.4 - Indicate if existing streets are public or private; provide street names, widths, curbs, sidewalks, and utility locations, all fully dimensioned.

13. COMMENT: 2-06.4.9.H.4 – Please see comment 9.

2-06.4.9.H.5 - If utilizing parking area access lanes (PAALs), they shall be designed in accordance with Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

14. COMMENT: 2-06.4.9.H.5 – Sheet 5 calls out an underground parking garage. Please include all details to ensure clearance and PAALs are adequately dimensioned as noted by the standard above. Also, sheet 6 calls out covered parking canopy. Please include the height of the parking canopy.

2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

15. COMMENT: 2-06.4.9.H.5.a – Based on the provided parking calculation, 95.5 parking spaces are required however only 90 spaces are provided. An Individual Parking Plan (IPP) will be required for this reduction. Please reach out to Mark Castro at Mark.Castro@tucsonaz.gov for IPP submittal requirements. Also, please demonstrate you meet the requirements of UDC 7.4.6.D.2.b for the ADA parking space adjacent to the trash enclosure as noted by the standard above. Lastly, Sheet 2 calls out the EV Ready and EV Capable spaces being located in the parking garage. Please include details about these parking spaces as nothing was provided for the underground parking structure.

2-06.4.9.H.5.d - Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided.

16. COMMENT: 2-06.4.9.H.5.d – Clearly label the location of the short term bicycle parking location(s) as noted by the standard above.

2-06.4.9.J - If street dedication is not required or proposed and the project site is adjacent to a Major Street or Route, draw the Major Street right-of-way lines for those streets. (Add the MS&R future sidewalk, right-of-way lines, sight visibility triangles, etc.)

17. COMMENT: 2-06.4.9.J – Please see comment 12 as it relates to the Sight Visibility Triangles.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

18. COMMENT: 2-06.4.9.Q – Please provide the specific use within the footprint of each building as noted by the standard above.

2-06.4.9.V - For gang mailboxes indicate location to assure there are no conflicts with other requirements, such as pedestrian accessibility, utilities, and landscaping.

19. COMMENT: 2-06.4.9.V – Please indicate where mail collection is located as noted by the standard above.

2-06.4.9.W - Indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

20. COMMENT: 2-06.4.9.W – If applicable, please show any proposed signage to assure there are no conflicts with other requirements as noted by the standard above.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
12/08/2025 CDRC Application Completeness Express REVIEW COMPLETED
12/11/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added: TAA, ADDRESSING, TEP, ADOT, REALESTATE, ENV SERV, SWG, USPS, and PAG to the workflow. Review request email sent to TAA, ADDRESSING, TEP, ADOT, and FYI email sent to, SWG USPS PAG.
12/17/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED jgomes@azdot.gov
on behalf of
ADOT SC Traffic Engineering - ADOT
​CDRC​
Good Morning,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
12/11/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/18/2025 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Pima County Addressing approves of TD-DEV-1225-00302.

We have assigned 120 E 14th Street as the admin address and address for building 2.

Thank you,





David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
12/11/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/02/2026 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED December 31, 2025
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-1225-00302, 1st Submittal, All Saints Site 3 / 415 S. 6th Ave, Tucson, AZ. 85701,
Received December 11, 2025
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-1225-00302, 1st Submittal, a
development plan for a new multifamily use at 415 S. 6th Ave. This development is located in
the S.W. quarter of the N.E. quarter of Section 13, Township 14S, Range 13E, of the Gila and
Salt River Meridian. The development site occupies parcel numbers 117-07-3420, 117-07-3430,
117-07-3440, 117-07-3410, 117-07-3400, 117-07-3390, covers approximately 1.38 ± acres, and
is zoned as Historic Commercial 3 Zone (HC-3). The nearest major roadway intersection is East
14th Street and South 6th Avenue, approximately 50 feet to the northwest of the subject
development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the 1st submittal of this project and is not requiring a
resubmittal of this project.
Although this project does not propose a change in plan designation or zoning the Tucson
Airport Authority highly recommends the applicant add the following notes into the general notes
of the revised development plan. This project is located approximately 5.91 miles northwest of
Tucson International Airport and is within FAA traffic pattern airspace, an area which would be
subject to aircraft overflight and noise due to being in close proximity to Tucson International
Airport.
The proposed notes would provide a means of assuring that future owners and tenants of the
property are aware they are in proximity an airport and further assures the continued right of the
City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson
International Airport the right to utilize the airspace above or near the property. This would be
accomplished through the property owner recording the Avigation Easement and providing the
Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport
Authority believes the proposed note helps to support the City of Tucson Airport Environs
Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4).
1. "That prior to the City's approval of the proposed development, the property owner must
record the Avigation Easement that discloses the existence and operational
characteristics of the Tucson International Airport to future owners or tenants of the
property and further conveys the right to the public to lawfully use the airspace above the
property. The Avigation Easement shall be recorded in a manner with the Pima County
recorder which shall document it as having title liability. The content of such documents
shall be according to the form and instructions provided.”
The current property owner or person authorized to sign on behalf of the current property
owner must complete, sign, and record the Avigation Easement. Please record the
Avigation Easement with the Pima County Recorder’s Office. Then send a complete
copy of the recorded easement document to Tucson Airport Authority by either email
(send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux
Manager of Planning
Tucson Airport Authority
7250 South Tucson Blvd, Suite 300
Tucson, AZ 85756”
2. Applicable to residential uses only
“The property owner/developer/applicant must provide the Airport Disclosure Statement
form, at time of sale, to the new property owners with all new unit purchases. In the
event the development of any residential uses does not involve the sale of new units but
is instead offering rental residential units to the public, the new tenant of the rental unit
must be provided a copy of the Airport Disclosure Statement form. The intent of the
Airport Disclosure Statement form is to educate and notify the new residents that they
are living near an airport. The content of such documents shall be according to the form
and instructions provided.”
The property owner (for itself or its tenants) shall forward a signed copy of the Airport
Disclosure Statement form to the Tucson Airport Authority within ten (10) days of
signature, using the Scott Robidoux mailing address provided above.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
12/30/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
December 30, 2025
WO#T171779
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: ALL SAINTS SITE 3
TD-DEV-1225-00302
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 12/11/2025. There are existing facilities within the development which
are depicted upon the plan. Possible conflicts with TEP poles and lines. Please contact
Design if removal/relocation is required.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Salazar
(520) 305-6713
msalazar@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power

TD-DEV-1225-00302
Lopez, Patty<PattyLopez@tep.com>
​CDRC​
​Salazar, Martin <MSalazar@tep.com>;​Design Admins <DesignAdmins@tep.com>​
Hello,



Attached is the response letter for the subject line project.



Thank you,

Patty Lopez

Tucson Electric Power
12/11/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/02/2026 Fire New Construction Standard REVIEW COMPLETED
12/11/2025 MITZ District Standard REVIEW COMPLETED
12/09/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
12/10/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
12/11/2025 ROW Review REVIEW COMPLETED