Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-1225-00301
Parcel: 137055410

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1225-00301
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2026 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT 4350 E. Irvington Road
Post Office Box 711, Tucson, AZ 85702
January 8, 2026
WO#T171553
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Tucson Spectrum Storage
TD-DEV-1225-00301
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 12/9/2025. There are existing facilities within the
development which are depicted upon the plan. POSSIBLE CONFLICTS WITH
UNDERGROUND FACILITIES ALONG CALLE SANTA CRUZ. PLEASE CONTACT
TEP DESIGN IF RELOCATION IS REQUIRED Further: Existing TEP facilities &
easement locations missing from development plan
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Fred Quintero
(520) 235-6329
fquintero@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
01/02/2026 NPPO Standard REQUIRES RESUBMIT Please see site landscape comments for NPP Ordinance requirements.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
12/15/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-1225-00301
Location: 5493 S CALLE SANTA CRUZ
Review Date: 12/15/2025

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Comments:
1. Provide the development package case number, TD-DEV-1225-00301, adjacent to the title block on all sheets.
2. The Geotech report provided will be required for resubmission. It appears the report is from 2022 when a multi-family development was proposed for this site. It is understood that the parameters of the ground may not have changed over that time, but the scope of analysis as well as building recommendations do not align with what is proposed now which is why a new report or recertification with an updated stamp from the engineer will be required to show the analysis still holds true to this new proposed development. There is also no analysis into possible recommendations relating to the underground stormwater infrastructure underneath the site.
Parking:
3. Wheel stops will be required at all parking spaces adjacent to the sidewalks so as not to reduce the sidewalk path to less than 4 feet. UDC 7.4.6 Sidewalks that are 6 and a half feet or wider will not require adjacent parking spaces to have wheel stops
4. The minimum standard parking space size is 8.5 FT X 18 FT UDC 7.4.6 if 17-feet would like to be proposed, a Parking Design Modification Request (PDMR) will be required to reduce the requirement from 18-feet to 17-feet. UDC 7.4.10 It will be required that you contact Loran Shamis Principal Planner at Loran.Shamis@tucsonaz.gov about receiving the PDMR application file.

Marco Contreras
Engineering Associate – Site Engineering
Marco.contreras@tucsonaz.gov
01/02/2026 Site Landscape Standard REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW 3-STORY, 90,000 SF PERSONAL STORAGE BUILDING
ACTIVITY NO: TD-DEV-1225-00301
ADDRESS: 5493 S CALLE SANTA CRUZ
ZONING: C-3 COMMERCIAL ZONE
LAND USE: MULTIUNIT STORAGE FACILITY
01.02.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS PER THE CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM) FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING.

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL OF THE SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. At the western boundary and the 6-foot vegetative screen: Can that area include a contour that depicts a 6-inch depth WHIA. This new depressed area can be included as part of WHIA-1 square footage.

2. It appears that a portion of the building roof is draining to the west. The pink dashed line representing the subwatershed should include a portion of the building roof top square footage as indicated by the flow arrows, downspouts and splashpads on the west side of the building.

3. Some flow line arrows shown on the CRWH Plan don’t match what is being shown on the grading plan. Additional flow arrows should be added to the CRWH Plan and grading plan that indicate the flow direction around the west side of the building toward WHIA-1 basin at the south of the building.

4. The east side of the building scupper and tree planting island locations are not matching throughout the plan set. The grading plan shows the scuppers at an angle draining to the two central tree planting islands. Adjust the landscape plans to match the line work on the civil plans.

5. The parking lot planting islands to the east are existing and currently have canopy trees. Is the plan to remove the existing trees due to the curbing removal and redesign of the islands and replace with what is proposed on the planting plan? If the proposed trees are in addition to the existing, then please show the existing tree grayed back and called out on the planting plan.

6. The planting islands to the east of the building should be depressed even if just for rainfall only catchment. The grading plan does not indicate that the areas are depressed. Please add spot elevations at the bottom of the planting island areas indicating the 6-inch depression and notes to the grading plan and CRWH plan that state - all new planting areas should be depressed 6 inches from top of curb to the top of the inorganic ground cover if there are no curb cuts provided.

7. The native plants in the existing planting islands may be related to an overall NPPO/mitigation plan provided in the past for the entire site. If the trees are going to be removed, then please provide explanation for how the site is going to comply with the NPP Ordinance or provide a NPPO Waiver with the next submittal. Attached below is a link to a new fillable NPPO Waiver for your use.

https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/applicationsforms/nppoapp-2025-v.2-fillable-1.pdf

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
01/06/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

TO:
Development Services Department
Plans Coordination Office

FROM:
Fernando Garcia
Site Zoning Review Section

PROJECT:
Development Package
5493 S Calle Santa Cruz, Tucson, AZ 85706
TD-DEV-1222-00090

TRANSMITTAL DATE: January 5, 2026
DUE DATE: December 31, 2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 4, 2026.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

2-06.4.2.B - A brief legal description and a statement as to whether the project is a re-subdivision are to be provided. On re-subdivisions, provide the recording information of the existing subdivision plat;

1. COMMENT: 2-06.4.2.B – Provide legal description of the property under the location map.

As the proposed building structure straddles existing property lines across three parcels, it appears that a lot combination followed by a lot line reconfiguration will be required for this DP to receive Site Zoning approval.


2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

2. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-1225-00301, adjacent to the title block on each sheet.


2-06.4.9.H.5.a - Show all motor vehicle off-street parking spaces provided, fully dimensioned. As a note, provide calculations on the number of spaces required (include the ratio used) and the number provided, including the number of spaces required and provided for the physically disabled. The drawing should indicate parking space locations for the physically disabled. A typical parking space detail shall be provided for both standard parking spaces and those for the physically disabled. For information on parking requirements for the physically disabled, refer to adopted building and accessibility codes of the City of Tucson. Design criteria for parking spaces and access are located in Section 7.4.6, Motor Vehicle Use Area Design Criteria, of the UDC.

3. COMMENT: 2-06.4.9.H.5.a – The 15 parking spaces proposed immediately in front of the building are shown to be 17’ in depth, which is a foot shorter than the minimum standard parking space size of 18’ in depth per UDC 7.4.6-A.

A Parking Design Modification Request (PDMR) will be required to be submitted and approved to allow the reduced parking space dimensions. Please reach out to Loran Shamis, Principal Planner, Site Zoning at loran.shamis@tucsonaz.gov or Stephen Blood, Site Engineering Section Lead at stephen.blood@tucsonaz.gov for a copy of the PDMR application and to submit.


COMMENT: Development package TD-DEV-1222-00090 for a multifamily development remains open. This DP must be voided or withdrawn prior to final approval of this new DP. Please reach out to CDRC at cdrc@tucsonaz.gov in case of any questions regarding this issue.

If you have any questions about this transmittal, contact Site Zoning Reviewer Fernando Garcia at fernando.garcia2@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
12/04/2025 CDRC Application Completeness Express REVIEW COMPLETED
12/09/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added: ADOT, TEP, TAA, addressing, SWG, USPS, and PAG to the workflow. Review request email sent to ADOT, TEP, TAA ,ADDRESSING and FYI email sent to, SWG USPS PAG.
12/31/2025 Commercial Plumbing Standard REVIEW COMPLETED
12/17/2025 External Reviewers - Arizona Department of Transportation (ADOT) Standard REVIEW COMPLETED Re: TDC External Review PERMIT: TD-DEV-1225-00301Please Sign-In DUE: 1/2/2026
jgomes@azdot.gov
on behalf of
ADOT SC Traffic Engineering - ADOT
​CDRC​
Good Afternoon,

ADOT has no comments on this DEV.

Thank you for the opportunity to review.
12/09/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/12/2025 External Reviewers - Pima County Addressing Standard REVIEW COMPLETED Good afternoon,

Pima County Addressing approves of TD-DEV-1225-00301. The applicant needs to select one site address for the project; we will retire the other site address.



Thank you,





David Wilging

Planner I - Addressing Division

Pima County Development Services

201 N. Stone Avenue 1st Floor

Tucson, Arizona 85701

520-724-6381
12/09/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
12/31/2025 External Reviewers - Tucson Airport Authority Standard REVIEW COMPLETED December 30, 2025
Planning and Development Services
City of Tucson
201 North Stone Avenue
Tucson, AZ. 85701
RE: TD-DEV-1225-00301, 1st Submittal, Tucson Spectrum Storage / 5493 S. Calle Santa Cruz,
Tucson, AZ. 85706, Received December 9, 2025
To whom this may concern,
Thank you for the opportunity to comment on TD-DEV-1225-00301, 1st Submittal, a
development plan for a new personal storage use at 5493 S. Calle Santa Cruz. This
development is located in the S.E. quarter of the S.W. quarter of Section 2, Township 15S,
Range 13E, of the Gila and Salt River Meridian. The development site occupies parcel number
137-05-5400, covers approximately 2.06 ± acres, and is zoned as Commercial 3 Zone (C-3).
The nearest major roadway intersection is South Calle Santa Cruz and West Drexel Road,
approximately 1,200 feet to the southwest of the subject development.
This site does lie within the Tucson International Airport avigation easement requirements and
public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority approves the 1st submittal of this project and is not requiring a
resubmittal of this project.
Although this project does not propose a change in plan designation or zoning the Tucson
Airport Authority highly recommends the applicant add the following notes into the general notes
of the revised development plan. This project is located approximately 2.16 miles northwest of
Tucson International Airport and is within FAA traffic pattern airspace, an area which would be
subject to aircraft overflight and noise due to being in close proximity to Tucson International
Airport.
The proposed notes would provide a means of assuring that future owners and tenants of the
property are aware they are in proximity an airport and further assures the continued right of the
City of Tucson, Tucson Airport Authority, and all persons lawfully utilizing the Tucson
International Airport the right to utilize the airspace above or near the property. This would be
accomplished through the property owner recording the Avigation Easement and providing the
Airport Disclosure Statement to the new residents of all residential uses. The Tucson Airport
Authority believes the proposed note helps to support the City of Tucson Airport Environs
Overlay Zone and supports Plan Tucson – Regional and Global Positioning policy 4 (RG-4).
1. "That prior to the City's approval of the proposed development, the property owner must
record the Avigation Easement that discloses the existence and operational
characteristics of the Tucson International Airport to future owners or tenants of the
property and further conveys the right to the public to lawfully use the airspace above the
property. The Avigation Easement shall be recorded in a manner with the Pima County
recorder which shall document it as having title liability. The content of such documents
shall be according to the form and instructions provided.”
The current property owner or person authorized to sign on behalf of the current property
owner must complete, sign, and record the Avigation Easement. Please record the
Avigation Easement with the Pima County Recorder’s Office. Then send a complete
copy of the recorded easement document to Tucson Airport Authority by either email
(send to srobidoux@flytucson.com) or to the mailing address provided below.
Scott Robidoux
Manager of Planning
Tucson Airport Authority
7250 South Tucson Blvd, Suite 300
Tucson, AZ 85756”
2. Applicable to residential uses only
“The property owner/developer/applicant must provide the Airport Disclosure Statement
form, at time of sale, to the new property owners with all new unit purchases. In the
event the development of any residential uses does not involve the sale of new units but
is instead offering rental residential units to the public, the new tenant of the rental unit
must be provided a copy of the Airport Disclosure Statement form. The intent of the
Airport Disclosure Statement form is to educate and notify the new residents that they
are living near an airport. The content of such documents shall be according to the form
and instructions provided.”
The property owner (for itself or its tenants) shall forward a signed copy of the Airport
Disclosure Statement form to the Tucson Airport Authority within ten (10) days of
signature, using the Scott Robidoux mailing address provided above.
Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-
573-4811.
Respectfully,
Scott Robidoux, C.M.
Manager of Planning
cc file
12/09/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
01/02/2026 Fire New Construction Standard REVIEW COMPLETED
01/06/2026 Historic REVIEW COMPLETED Per A.R.S. §41-865, if human remains or funerary objects are encountered during ground disturbing activities on private land, ground disturbance must be stopped and the Arizona State Museum Repatriation Coordinator must be notified (asm-repatriation@email.arizona.edu). See the following website for more information about A.R.S. §41-865: https://statemuseum.arizona.edu/crm/human-burials-sacred-objects-and-you.
12/04/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
12/09/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
12/19/2025 ROW Engineering Review Standard REVIEW COMPLETED No ROW improvements required.
12/11/2025 ROW Review REVIEW COMPLETED
01/13/2026 TW New Development Review REVIEW COMPLETED