Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1223-00494
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/29/2024 | Commercial Plumbing | APPROVED | |||
01/08/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | January 5, 2024 WO#T100828 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Hospital Emergency Department Expansion at Tucson Medical Center TD-DEV-1223-00494 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 1/2/2024. There are no existing facilities within the development and are thus no conflicts with TEP Facilities at this time. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Gabriela Bielecka Tucson Electric Power Company New Business Residential Project Manager P. O. Box 711 (OH 204) Tucson, AZ 85703 (520) 651-3833 Should you have any technical questions, please contact the area designer, Ryan Romero at (520) 240-4575. Sincerely, Design Admins Design Admins Tucson Electric Power |
||
01/30/2024 | NPPO | APPROVED | |||
01/30/2024 | Site Engineering | APPROVED | |||
01/30/2024 | Site Landscape | APPROVED | |||
01/30/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
01/08/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TMC - Emergency Department Expansion Development Package (1st Review) TD-DEV-1223-00494 TRANSMITTAL DATE: January 8, 2024 DUE DATE: February 1, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 27, 2024. CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-1223-00494, adjacent to the title block on all sheets. 2. COMMENT: 2-06.4.6 – Provide a reduced-scale map of the entire PAD on the first sheet, indicating the location of the portion being developed. Additional comments: 3. COMMENT: - Per PAD-16 Section 3.4.1 Provide a copy of the required Architectural Review Board letter with your next submittal. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
12/26/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
01/02/2024 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
01/02/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
01/02/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
01/02/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
01/29/2024 | Fire New Construction | REVIEW COMPLETED | |||
12/28/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
12/27/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
12/27/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
01/25/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |