Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-1223-00473
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/20/2024 | Commercial Plumbing | APPROVED | |||
05/30/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
05/13/2024 | Site Engineering | REQUIRES RESUBMIT | 1. Previous comment 3 not fully addressed - The corrected SWPPP was not submitted. Also, please include in the plan set for the record the explanation for how this site is going to handle the stormwater runoff from the new impervious surfaces proposed - this could be in the form of a drainage statement. 2. Previous comment 5 not fully addressed - Get with DTM to determine the future right-of-way to be able to show it on the plans. 3. Please reach out to Union Pacific Railroad for a courtesy notice of the proposed work in close proximity to their railroad lines on the east side of the park. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
05/23/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: NEW SPLASH PAD, PLAY EQUIPMENT, COMFORT STATION, MULTI-USE PATHS AND PARKING AREAS. IMPROVEMENTS TO EXISTING BASEBALL FACILITIES. ACTIVITY NO: TD-DEV-1223-00473 ADDRESS/PARCEL: 401 E 22ND ST TUCSON/11709158B ZONING: R-2 RESIDENCE ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. COMMENTS: Prior Site Landscape review comments have been addressed, other than number 1 below. 1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval. If you have any questions about this comment, I can be reached at chad.keller@tucsonaz.gov |
||
05/15/2024 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Wyatt Berger Lead Planner PROJECT: Improvements to Santa Rita Park Development Package (2nd Review) TD-DEV-1223-00473 TRANSMITTAL DATE: May 15, 2024 DUE DATE: May 17, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM). Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. The new one-year expiration date is May 15, 2025. 1. COMMENT: 2-06.4.9.H.5.d – This comment has not yet been addressed. Per UDC Table 7.4.8-1, 0.25 short-term bicycle parking spaces are required per basketball court, with a minimum requirement of two spaces. Eight total short-term bicycle parking spaces are required for the site. Correct the short-term bicycle parking calculation on Sheet G 0.1. Additionally, remove the reference to 2-06.4.9.H.5.d relating to long-term bicycle parking. 2. COMMENT: 2-06.4.9.H.5.d – Sheet C 1.1 only shows the location of one bicycle rack. Indicate the locations of all required bicycle parking facilities. Provide a detail demonstrating how the short-term bicycle parking facilities comply with UDC 7.4.9.B. See UDC Figure 7.4.9-C for an example detail. If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at: https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
05/10/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
05/30/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, Thank you for your patience. ADOT has no additional comments on this DEV. |
||
05/13/2024 | ROW Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |