Permit Number: TD-DEV-1222-00077
Parcel: 141185730

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1222-00077
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/02/2024 CDRC Post Review PENDING ASSIGNMENT
05/02/2024 NPPO REQUIRES RESUBMIT Please see Site Landscape comments.

Thank you.
04/08/2024 Site Engineering REQUIRES RESUBMIT Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview

1. Show 14 foot by 40 foot clear space in front of dumpster enclosure as required by TSM 8-01.5.3 B.
2. Provide a detail for the dumpster enclosure that complies with standards outlined in TSM 8-01.5.2.
3. Although recycling service is not required, the site must have capacity for recycling service in addition to trash service. A double enclosure will be required.

Lianne Evans
lianne.evans@tucsonaz.gov
05/02/2024 Site Landscape REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: PROPOSED CONTRACTOR STORAGE RITA RANCH
ACTIVITY NO: TD-DEV-1222-00077
ADDRESS/PARCEL: 9683 E RITA COMMERCE DR/ 141185730
ZONING: I-1 LIGHT INDUSTRIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

LANDSCAPE COMMENTS:
1. Ensure that Zoning, Engineering comments and concerns are addressed prior to landscape section approval.

2. Please add a soil moisture gauge and rain shut-off devise to the irrigation details sheet 36 of 46. If you need an example pdf detail, please let me know and I will email them to you.

3. Penstemon SP. is not on the Native Seed List per UDC 5-02.6.0 Exhibit 1. Please select a replacement from the Native Seed List.

4. Previous reviewer comments not completed: Please provide a summary of quantities to the NPPP Plan of total inventoried protected native plants, the total number of mitigation plants and the total number of TOS plants. Having the mitigation and transplant numbers highlighted on the NPPP will make it easier to account for the plant material that are shown on the Landscape Planting Legend.

5. Please identify the site monitor and list contact information on the NPPP.

If you have any questions, please contact me at chad.keller@tucsonaz.gov
04/10/2024 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Contractor Storage – Rita Ranch
Development Package (2nd Review)
TD-DEV-1222-00077

TRANSMITTAL DATE: April 10, 2024


COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is April 10, 2025.

1. It is acknowledged that the following comment from the last review will be addressed at a later date: COMMENT: 2-06.4.8.B – The existing easement shown to be abandoned will need to be abandoned prior to approval of this plan. Provide the recordation information for the abandonment on the plan.

2. It is acknowledged that the following comment from the last review will be addressed at a later date: 2-06.4.9.E – As it appears that you are proposing to split off a portion of parcel 141-18-5750 from this project and the private Land Split must be submitted and approved prior to approval of this plan. Also the combination needs to be completed prior to approval of this plan. The combination can be processed within the land split.

3. It does not appear that the long term bike parking comment was addressed fully: 2-06.4.9.H.5.d – Clearly show the required long-term bicycle parking and provide a long-term bicycle parking space detail that demonstrates how the requirements of UDC Article 7.4.9 are met. Please refer to 7.4.9.D.2.A of the UDC regarding security, and 7.4.9.D.4 and 5 for signage and lighting.

4. It is acknowledged that the following comment will be addressed at a later date:
As it appears street dedication is proposed at the new cul-de-Sac this dedication must be completed prior to approval of this plan. If approved provide the recordation information for this dedication on the plan.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/01/2024 CDRC Application Completeness REVIEW COMPLETED