Permit Number: TD-DEV-1222-00074
Parcel: 116210220

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.2

Permit Number - TD-DEV-1222-00074
Review Name: DEVELOPMENT PACKAGE REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/21/2023 Commercial Plumbing APPROVED
05/24/2023 Site Landscape APPROVED Approved conditionally.

Please include the total % of rainwater harvesting that is being met on your commercial rainwater harvesting plan.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
06/22/2023 CDRC Post Review Express PENDING ASSIGNMENT
06/05/2023 Site Engineering REQUIRES RESUBMIT 1. Please provide screenshot of approval email from Andy Vera for the roll out bins, as well as the encroachment of the waste enclosure into the parking space
2. Provide a callout for the bollards in the waste enclosure, ensure they meet the distance requirements of TSM 8-01.5.2B
3. Provide a keynote for the sidewalk ramp, with a reference to detail H/2
4. Show the 4' pedestrian circulation path is maintained with a 2.5' overhang from edge of wheel stop

Scott Haseman
scott.haseman@tucsonaz.gov
06/22/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Wyatt Berger
Lead Planner

PROJECT: Pueblo Vida
Development Package (2nd Review)
TD-DEV-1222-00074

TRANSMITTAL DATE: June 23, 2023

DUE DATE: June 17, 2023

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. New one year expiration date is June 23, 2024.

1. COMMENT: 2-06.4.3 – Add the development package case number, TD-DEV-1222-00074, adjacent to the title block on all sheets.

2. COMMENT: 2-06.4.9.H.5 – Ensure that the proposed PAAL is setback at least two feet from the existing and proposed building (UDC 7.4.6.F.2.b). Provide a dimension of at least two feet demonstrating compliance with this standard.

3. COMMENT: 2-06.4.9.H.5.d – This comment was not entirely addressed. Ensure that the proposed short-term bicycle parking facility meets the requirements of UDC 7.4.9. Demonstrate that the location of the short-term bicycle parking facilities is within 50 feet of each public entrance to a building as measured along the most direct pedestrian route (UDC 7.4.9.C.2.a). Additionally, provide a detail of the short-term bicycle parking facilities to demonstrate compliance with UDC 7.4.9.B.1 and .2. Refer to Figures 7.4.9-B and .C.

4. COMMENT: 2-06.4.9.T – See engineering comment #1. Provide a screenshot of approval email from Andy Vera for the roll-out bins, as well as the encroachment of the waste enclosure into the parking space.

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or (520) 837-4951.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package.
05/18/2023 CDRC Application Completeness Express REVIEW COMPLETED