Permit Number: TD-DEV-1222-00073
Parcel: 30503004B

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-1222-00073
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/12/2023 Site Landscape APPROVED
12/23/2022 NPPO NOT REQUIRED
03/02/2023 CDRC Post Review PENDING ASSIGNMENT
03/01/2023 Commercial Plumbing REQUIRES RESUBMIT 1. The use of saddle-type fittings to connect to a private sewer is prohibited, use directional wye fittings to connect the building sewers to the sewer main. Reference: Section 707.1 (6), IPC 2018 and Detail RWRD 401.
2. If the existing sewer has manholes, provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.
02/23/2023 Fire New Construction REQUIRES RESUBMIT DP shall show the location of existing and new fire hydrants
DP shall show the underground fire sprinkler line
DP shall show the square footage and access to the new buildings

Questions:

Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
03/02/2023 Site Engineering REQUIRES RESUBMIT 1. Include the total area of disturbance on the plans.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
03/01/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: COT Police Department Shooting Range & Virtual Training Facility
Development Package (1st Review)
TD-DIV-1222-00073

TRANSMITTAL DATE: March 1, 2023

DUE DATE: March 2, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 26, 2023.

2-06.4.0 CONTENT REQUIREMENTS

1. COMMENT: 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block.

2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DIV-1222-00073, adjacent to the title block on all sheets.

2-06.4.7 - General Notes
The following general notes are required. Additional notes specific to each plan are required where applicable.

2-06.4.7.A - Zoning and Land Use Notes

3. COMMENT: 2-06.4.7.A.4 – The existing and proposed use listed under General Note 3 are not correct.

4. COMMENT: 2-06.4.7.A.6.a - As Wilmot Rd is designated as an Arterial on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R)

2-06.4.7.A.8 - For development package documents provide:

5. COMMENT: 2-06.4.7.A.8.b – Provide a lot coverage calculation on the plan that meets the requirements of UDC Article 6.4.3.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

6. COMMENT: 2-06.4.9.Q – Provide the square footage, height and use of each building within the footprint of the building(s).

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
12/15/2022 CDRC Application Completeness REVIEW COMPLETED
01/31/2023 CDRC Review Coordinator REVIEW COMPLETED
12/27/2022 OK to Submit - Engineering REVIEW COMPLETED
12/23/2022 OK to Submit - Landscape REVIEW COMPLETED
12/27/2022 OK to Submit - Zoning REVIEW COMPLETED
03/02/2023 ROW Engineering Review REVIEW COMPLETED No Comments