Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.1
Permit Number - TD-DEV-1222-00073
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2023 | Site Landscape | APPROVED | |||
12/23/2022 | NPPO | NOT REQUIRED | |||
03/02/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
03/01/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. The use of saddle-type fittings to connect to a private sewer is prohibited, use directional wye fittings to connect the building sewers to the sewer main. Reference: Section 707.1 (6), IPC 2018 and Detail RWRD 401. 2. If the existing sewer has manholes, provide the rim elevation of the next upstream sanitary manhole. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. |
||
02/23/2023 | Fire New Construction | REQUIRES RESUBMIT | DP shall show the location of existing and new fire hydrants DP shall show the underground fire sprinkler line DP shall show the square footage and access to the new buildings Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |
||
03/02/2023 | Site Engineering | REQUIRES RESUBMIT | 1. Include the total area of disturbance on the plans. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
03/01/2023 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: COT Police Department Shooting Range & Virtual Training Facility Development Package (1st Review) TD-DIV-1222-00073 TRANSMITTAL DATE: March 1, 2023 DUE DATE: March 2, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is December 26, 2023. 2-06.4.0 CONTENT REQUIREMENTS 1. COMMENT: 2-06.4.2.D – Provide the page number and the total number of pages in the package (i.e., sheet xx of xx) within the title block. 2. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DIV-1222-00073, adjacent to the title block on all sheets. 2-06.4.7 - General Notes The following general notes are required. Additional notes specific to each plan are required where applicable. 2-06.4.7.A - Zoning and Land Use Notes 3. COMMENT: 2-06.4.7.A.4 – The existing and proposed use listed under General Note 3 are not correct. 4. COMMENT: 2-06.4.7.A.6.a - As Wilmot Rd is designated as an Arterial on the COT MS&R Map provide a general note on the cover sheet stating “THIS PROJECT IS DESIGNED TO MEET THE OVERLAY ZONE(S) CRITERIA, UDC ARTICLE 5.4 MAJOR STREETS AND ROUTES SETBACK ZONE (MS&R) 2-06.4.7.A.8 - For development package documents provide: 5. COMMENT: 2-06.4.7.A.8.b – Provide a lot coverage calculation on the plan that meets the requirements of UDC Article 6.4.3. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 6. COMMENT: 2-06.4.9.Q – Provide the square footage, height and use of each building within the footprint of the building(s). If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
||
12/15/2022 | CDRC Application Completeness | REVIEW COMPLETED | |||
01/31/2023 | CDRC Review Coordinator | REVIEW COMPLETED | |||
12/27/2022 | OK to Submit - Engineering | REVIEW COMPLETED | |||
12/23/2022 | OK to Submit - Landscape | REVIEW COMPLETED | |||
12/27/2022 | OK to Submit - Zoning | REVIEW COMPLETED | |||
03/02/2023 | ROW Engineering Review | REVIEW COMPLETED | No Comments |