Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE REVIEW v.3
Permit Number - TD-DEV-1222-00072
Review Name: DEVELOPMENT PACKAGE REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/25/2023 | Commercial Plumbing | APPROVED | |||
| 05/16/2023 | Site Engineering | APPROVED | |||
| 05/16/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 05/15/2023 | Site Zoning | REQUIRES RESUBMIT | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Wyatt Berger Lead Planner PROJECT: City of Tucson Fire Station 13 Development Package (2nd Review) TD-DEV-1222-00072 TRANSMITTAL DATE: May 15, 2023 DUE DATE: May 20, 2023 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM). Per UDC Section 3.3.3.G.5.c, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. The new one-year expiration date is May 15, 2024. 10. COMMENT: 2-06.4.8.B –Provide the abandonment information for the existing electrical easement as indicated on Sheet 5. 12. COMMENT: 2-06.4.9.H.5 – This comment was not addressed. As an expansion greater than 25% is proposed, the existing motor vehicle use area shall be brought to current code standards in accordance with all of UDC Section 7.4.6, Motor Vehicle Use Area Design Criteria. 15. COMMENT: 2-06.4.9.L – Provide the recordation information for the proposed relocated electrical easement as indicated on Sheet 5. 19. COMMENT: 2-06.4.9.R – This comment was not addressed. Show on-site pedestrian circulation that connects all public access areas of the development to the adjacent right-of-way. A pedestrian connection is also required to the existing trash enclosure. Additionally, the existing on-site handicap accessed motor vehicle parking space does not meet the intent of this requirement. 20. COMMENT: 2-06.4.9.W – This comment was not addressed. Indicate the location of the handicap parking sign to assure there are no conflicts with pedestrian circulation. Provide a handicap sign detail as well. None of these requirements are shown in the resubmittal. If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov or at (520) 837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf. |
||
| 04/20/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 04/24/2023 | Fire New Construction | REVIEW COMPLETED |