Permit Number: TD-DEV-1126-00278
Parcel: 134050239

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1126-00278
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/10/2026 CDRC Post Review Express PENDING ASSIGNMENT
11/10/2026 CDRC Review Coordinator Express PENDING ASSIGNMENT
11/10/2026 Commercial Plumbing Standard PENDING ASSIGNMENT
11/10/2026 Fire New Construction Standard PENDING ASSIGNMENT
11/10/2026 NPPO Standard PENDING ASSIGNMENT
11/10/2026 ROW Engineering Review Standard PENDING ASSIGNMENT
11/10/2026 Site Engineering Standard PENDING ASSIGNMENT
11/10/2026 Site Landscape Standard PENDING ASSIGNMENT
11/10/2026 Site Zoning Standard PENDING ASSIGNMENT
11/06/2026 OK to Submit - Engineering Fast REQUIRES RESUBMIT Permit Activity Number: TD-DEV-1126-00278
Project: Development Package to Satisfy Code Violation: CE-VIO1026-04416
Location: 9405 E OLD SPANISH TR
Review Date: 11/6/2026
Reviewer: Dylan Molina – Engineering Associate - Site Engineering
Reviewer Contact: Dylan.Molina@tucsonaz.gov

Plan review for the above referenced activity number has been completed. This letter reflects comments to address to ensure approval from Site Engineering.
To facilitate timely reviews, please include a response letter, updated plans and any additional supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. DO NOT mark or highlight changes in the drawings at this stage — reserve revision markups for after issuance. Please provide response letter and updated plan set as separate files.

Site Engineering Review Comments:
1. This is a completeness check review ONLY. There will be more comments by reviewers to address code requirements. Site Engineering may have additional comments after the minimum is addressed below.
2. Grading has been completed without a permit per code violation CE-VIO1026-04416. Address the following comments and resubmit to this Development Package the missing details or reports.
3. Geotechnical Investigation Report — A Geotechnical Investigation Report prepared and sealed by a Professional Engineer registered in the State of Arizona is required [IBC 1803] and shall be submitted with the associated Development Package submittal. At a minimum, the report shall address the following:
a. Soil Bearing Capacity & Site Classification — Allowable soil bearing capacity, seismic site classification, expansive soil identification, and groundwater conditions, with all applicable foundation design recommendations for the proposed construction.
b. Grading & Earthwork — Recommendations for site preparation, fill compaction standards, and the suitability of on-site materials for reuse as engineered fill.
c. Pavement Design — Pavement design recommendations for all proposed drive aisles, parking areas, and access improvements, including R-value or CBR test results as applicable.
d. Retaining Walls (if applicable) - Backfill requirements and wall foundation recommendations.
e. Drainage Manual 14.2.6 Items — Soil classification, soil erodibility, soil permeability and infiltration rate, slope stability, and groundwater elevation; a recommended minimum setback from buildings and other structures; an evaluation of whether hydro-collapsing soils are present on the site; and the boring log(s) and laboratory results supporting the above based on the required 30-foot boring test.
4. Provide missing SWPPP
a. Where the total area of disturbance is one (1) acre or more — or is part of a larger common plan of development that will ultimately disturb one acre or more — coverage under the AZPDES Construction General Permit is required. The applicant shall prepare a Stormwater Pollution Prevention Plan (SWPPP) and file a Notice of Intent with ADEQ prior to the start of any earth-disturbing activity.
b. A dust control permit from the Pima County Department of Environmental Quality is required separately and is triggered at the same threshold as the SWPPP. Confirm applicability with PDEQ prior to commencing site work.
5. Provide missing Drainage Report; the off-site impacts of extensive fill must be included in the report. A full drainage report shall be submitted with the application for the associated development package submittal. The report must demonstrate compliance with all applicable City of Tucson stormwater management requirements, including first-flush retention and balanced basin detention. The following references from the Standards Manual for Drainage Design and Floodplain Management (COT Drainage Manual) and the Design Standards for Stormwater Detention and Retention Manual (DSSDR) shall govern report preparation:
a. Report Formatting & Content: COT Drainage Manual §2.3; DSSDR Chapter 10
b. Flood Peak Estimation: COT Drainage Manual Chapter 4
c. Erosion Hazard Assessment: COT Drainage Manual Chapters 6 & 7
d. Drainage Facility Design Standards: COT Drainage Manual Chapters 9–11
e. First-Flush Retention & Detention Guidelines/Triggers: DSSDR Chapters 2, 3, & 4
6. After review of the plans differential grading has been triggered by proposed placement of fill in excess of two feet. For resubmission provide written justification based on engineering/technical reasons [TSM 2-01.8.1.A]
a. Differential grading is likely to impact drainage, as stated, impacts of off-site must be included in Drainage Report
7. Requesting TFD to review Development Package Submission for access on to the site for proposed Senior Care; be aware of applicable requirements for fire apparatus maneuverability and be prepared to provide relevant information for access.
8. Applicable Waste Management Standards:
a. Provide the Waste Stream Calculations for the entire site on the Development Package cover sheet or where able to on the plan set. [TSM 8-01.8.0]
b. Provide a trash enclosure detail(s) that is compliant with TSM 8-01.0.0. This should include all necessary information as well as include the required minimum clear space. This detail should be comparable to figures found in TSM 8-01.9.0.
c. Provide a detail displaying trash truck maneuverability for the trash enclosure in compliance with Technical Standards Manual, show it falls in compliance with back-up requirements. Maneuverability dimensions for operation are 14’x40’ & 28’x40’ for two enclosures. TSM 8-01.5.3 and TSM 8-01.5.3.F
d. All commercial developments are required to provide adequate space/capacity for both solid waste & recycling services [TSM 8-01.5.1.A]
9. Sidewalks shall be flood free for all storm discharges of up to and including a ten-year frequency flood event. Drainage flowing across all pedestrian circulation paths shall be designed and constructed to convey flows under the path for up to and including the ten-year frequency flood events, except at street intersections, pedestrian crossings, and PAAL pedestrian crossings. [TSM 7-01.4.1.E & 7-01.4.3.E]
a. Provide keynotes and call-outs identifying all downspouts and sidewalk scupper locations on all related site plans and/or building sheets. This information is required to demonstrate compliance and to ensure coordination with building permit plan review.
b. If downspouts from rooftops are to be discharged at grade-level, ensure that the stormwaters up to and including flow from a 10-year event are directed away from accessible parking stalls.
10. Provide dimensions for all curb return radii at the following locations: Internal drive aisles and roadway access points.
a. Confirm that all curb return radii comply with the dimensional requirements of Chapter 25, Streets and Sidewalks Standards and UDC 7.4.6.E.1.a. Where existing curb returns are to remain, document the existing radii and confirm compliance or identify any required modifications.
11. Sight visibility triangles (SVT) will need to be shown at all site access points from designated MS&R’s:
a. E OLD SPANISH TR has a designation as a COLLECTOR GATEWAY. [TSM 10-01.5.0]
12. Review of Administrative Manual Section 2-06 for application submittal requirements.

NOTICE: This is a completeness check review performed by both Site Engineering & Zoning to determine whether the submission in question is sufficient for full review by all applicable reviewing parties. As such, do not interpret the provided comments as finalized complete review comments. They are simply to address outstanding issues caught at this stage of submission.
11/10/2026 OK to Submit - Zoning Fast REQUIRES RESUBMIT See Engineering Comments
11/04/2026 CDRC Application Completeness Express REVIEW COMPLETED