Permit Number: TD-DEV-1125-00290
Parcel: 14021001B

Address:
1030 E BANTAM RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.5

Permit Number - TD-DEV-1125-00290
Review Name: DEVELOPMENT PACKAGE NEW v.5
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/07/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Provide the first floor elevation of the kiosk. With the rim elevation of the next upstream manhole at 2521’, it is likely that a backwater valve will be required, see Section 714.1, IPC 2018, as amended by the City of Tucson. [Initial comment: Provide the rim elevation of the next upstream sanitary manhole and the first-floor elevation. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson.]
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov
04/14/2026 External Reviewers - Tucson Electric Power (TEP) Standard REQUIRES RESUBMIT April 14, 2026
WO#T174179
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: WATERMILL 140047
TD-DEV-1125-00290
Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 3/31/2026. There are existing facilities within the development which are depicted upon the plan. COMMENTS ONLY PLEASE INDICATE APPROVAL WITH THE BELOW CHECK BOX PLEASE DO NOT ADJUST IF THERE ARE NO COMMENTS Further: TEP Easement Bk 5796 Pg 963 now shown on development plan.
Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans.
If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Fred Quintero
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
03/31/2026 Site Engineering Standard REQUIRES RESUBMIT Permit Activity Number: TD-DEV-1125-00290 (3rd Review)
Project: Installation of a new Watermill Water Kiosk Station
Location: 5301 S PARK AV
Review Date: 3/31/2026
Reviewer: Marco Contreras – Engineering Associate - Site Engineering
Related Cases:

*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. *
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Floodplain Code: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
Site Engineering Review Comments:
1. In compliance with TSM 7-01.4.3.A – The pedestrian pathway connecting the kiosk to the main site will be required to be 4-feet wide rather than 3-feet.
2. As there are parking spaces shown alongside the pathway, In compliance with UDC 7.4.6.H.1, wheel stops will be required. This is to prevent vehicles from potentially encroaching into said pathway. Ensure to provide wheel stop detail.
If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov
04/17/2026 Site Zoning Standard REQUIRES RESUBMIT CDRC TRANSMITTAL

FROM:
Bobby Parsons
PDSD Zoning Review Section

PROJECT:
Ice Kiosk – 5301 S. Park Ave. Tucson, AZ 85706
Development Package (3rd Review)
TD-DEV-1125-00290

TRANSMITTAL DATE: 4/17/2026
DUE DATE: 4/21/2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is January 14, 2027.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

CONTENT REQUIREMENTS

2-06.4.2 - The title block shall include the following information and be provided on each sheet:

2-06.4.2.D - The page number and the total number of pages in the package (i.e., sheet xx of xx).

1. COMMENT: 2-06.4.2.D – Previous comment 2 not addressed accurately. The page number refers to 1 of 13 sheets however only 4 sheets were submitted. Please ensure the page numbers reflect what the sheet index calls out.

2-06.4.5 - When the development package documents consists of more than one sheet, a sheet index (a legible drawing of the site showing the area represented on each sheet) is to be placed on the cover sheet or the second sheet.

2. COMMENT: 2-06.4.5 – Previous comment 5 not addressed. The sheet index refers to 13 sheets, however only 4 sheets were submitted. Please update the sheet index to include only the pages submitted with this Development Package or include all of the sheets in the sheet index.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2-06.4.9.Q - Provide the square footage and the height of each commercial, industrial, or business structure and the specific use proposed within the footprint of the building(s).

3. COMMENT: 2-06.4.9.Q – Follow up to previous comment 18. Please provide the height of the proposed kiosk as noted by the standard above.

2-06.4.9.R - Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

4. COMMENT: 2-06.4.9.R – Follow up to previous comment 19. Please address Site Engineering comments as it relates to the pathway width and wheel stop requirements adjacent to the pathway.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations

If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf