Permit Number: TD-DEV-1125-00290
Parcel: 14021001B

Address:
1030 E BANTAM RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.7

Permit Number - TD-DEV-1125-00290
Review Name: DEVELOPMENT PACKAGE NEW v.7
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/01/2026 Site Engineering Standard APPROVED
06/30/2026 Site Zoning Standard APPROVED
07/20/2026 Commercial Plumbing Standard REQUIRES RESUBMIT The junction of the building drain and the building sewer is defined as being 30 inches from the exterior wall of the building. RWRD Detail 401 specifies the installation of a cleanout 12 inches from the beginning of the public right of way. The Utility Plan, C3.0, only shows one cleanout. [Previous comment: Provide a cleanout at the junction of the building drain and the building sewer, and a cleanout in the building sewer prior to entering the right-of-way on Sheet C3.0. Currently, only one 4” sewer cleanout is shown. Reference: Section 708.1.3, IPC 2018 & Pima County Standard Detail RWRD 401, 2021.]
If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov