Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1125-00287
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/21/2025 | NPPO Standard | APPROVED | |||
| 11/18/2025 | Site Engineering Standard | APPROVED | |||
| 11/21/2025 | Site Landscape Standard | APPROVED | |||
| 11/19/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide backflow protection at each water meter location per Tucson Water Standard Detail SD 1802. Reference: Section 608.1, IPC 2018. 2. The maximum distance between cleanouts shall be 100 feet, measured along the developed pipe length from the upstream entrance of the cleanout. Reference: Section 708.1.1, IPC 2018. |
||
| 12/03/2025 | ROW Engineering Review Standard | REQUIRES RESUBMIT | Provide DTM Engineering planset for new Via Rio Pico roadway. See DTM Engineering Template at https://www.tucsonaz.gov/Departments/Transportation-Mobility/Maps-and-Records/DTM-Plan-Templates-DTM-Specific-Details-and-Standards. Planset should include Plan and Profile with pavement marking and signage plan. Okay for new roadway to be phased but design should be along abutting property. DTM comments have been added to attachments. |
||
| 11/19/2025 | Site Zoning Standard | REQUIRES RESUBMIT | CDRC TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: 7001 S. Wilmot Rd. Tucson, AZ 85756 Development Package (1st Review) TD-DEV-1125-00287 TRANSMITTAL DATE: 11/19/2025 DUE DATE: 11/20/2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 18, 2026. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) 2-06.3.0 FORMAT REQUIREMENTS CONTENT REQUIREMENTS 2-06.4.2 - The title block shall include the following information and be provided on each sheet: 2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet. 1. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-1125-00287, adjacent to the title block on each sheet. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 2-06.4.9.A - Draw in all proposed lot lines with approximate distances and measurements. 2. COMMENT: 2-06.4.9.A - This is a follow up comment to the site zoning review during the CIP process: As this site consists of several parcels, a lot combination will be necessary. If not pursued, then a covenant for development of real property will be required. Please see this link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/submission-documents/covenant-regarding-development-and-use-of-real-property-udc-with-release.pdf ***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations If you have any questions about this transmittal, Contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf |
||
| 11/18/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 11/19/2025 | Fire New Construction Standard | REVIEW COMPLETED | Add a Knox Lock at the vehicular gate by main entrance road | ||
| 12/08/2025 | Traffic Engineering Review Standard | REVIEW COMPLETED | No comments on traffic memo. No traffic concerns with park being built. |