Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1125-00285
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/17/2025 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 11/17/2025 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 11/17/2025 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 11/17/2025 | NPPO Standard | PENDING ASSIGNMENT | |||
| 11/17/2025 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 11/17/2025 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 11/17/2025 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 11/17/2025 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 11/14/2025 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | Permit: TD-DEV-1125-00285 Location: 1730 E PRINCE RD Review Date: 11/14/2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Comments: 1. Application incomplete – a drainage report showing full compliance with the City of Tucson’s first flush retention/ balanced basin detention requirements will be required for this development. Refer to the Design standards for Stormwater Detention and Retention Chapters 2, 3, & 4. Drainage report content and format requirements can be found in chapter 10 of the DSSDR as well. 2. Provide cut/fill quantities for this proposed development, refer to TSM 2-01.0.0, A grading plan will be required. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 11/17/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED |