Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1125-00280
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/03/2025 | Site Landscape Standard | APPROVED | Plans appear to show no vegetation being harmed or removed during the EV pedestal installation. Please replace any plant material that is removed or destroyed due to the installation of the EV equipment. | ||
| 12/03/2025 | Site Zoning Standard | APPROVED | |||
| 12/03/2025 | NPPO Standard | NOT REQUIRED | |||
| 11/20/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TD-DEV-1125-00280 Location: 9055 E CATALINA HY Review Date: 11/20/2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Site Engineering Comments: 1. Provide the development package case number, TD-DEV-1125-00280, adjacent to the title block on all sheets. 2. Provide the general note “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” Administrative Manual 2-06.4.7.B.1 3. Provide the general note “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” AM 2-06.4.7.B.3 4. Provide the general note “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” AM 2-06.4.7.C.2 If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 11/07/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | NO EXTERNAL REVIEWERS External Reviewers not required. No further action is required from the customer at this time. |
||
| 12/02/2025 | Commercial Plumbing Standard | REVIEW COMPLETED | |||
| 11/28/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 11/06/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 11/06/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 12/15/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | DTM has no comments | ||
| 11/25/2025 | ROW Review | REVIEW COMPLETED |