Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TD-DEV-1125-00278
Parcel: 13213073A

Review Status: In Review

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-1125-00278
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
N/A Commercial Plumbing Standard PENDING ASSIGNMENT
N/A Entitlements Standard PENDING ASSIGNMENT
N/A External Reviewers - Arizona Department of Transportation (ADOT) Standard PENDING ASSIGNMENT
N/A External Reviewers - Tucson Airport Authority Standard PENDING ASSIGNMENT
N/A External Reviewers - Tucson Electric Power (TEP) Standard PENDING ASSIGNMENT
N/A Fire New Construction Standard PENDING ASSIGNMENT
N/A NPPO Standard PENDING ASSIGNMENT
N/A ROW Engineering Review Standard PENDING ASSIGNMENT
N/A Site Landscape Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
11/26/2025 External Reviewers - COT Parks & Recreation Standard REQUIRES RESUBMIT Regarding TD-DEV-1125-00278, The City of Tucson Parks and Recreation Department will require that the project not encroach on the easement for the El Paso and Southwestern Greenway on the northern boundary of the parcel. If an easement does not currently exist, an easement must be granted per the Tucson Mayor & Council-approved "Pima Regional Trails System Master Plan" (PRTSMP). Development of the asphalt path in this location appears to already have taken place.



Description: Expansion of existing fuel facility + Costco at the Bridges

Parcel: 13213073A



Regards,



Joe Barr

Project Manager

Tucson Parks and Recreation

520-307-2811
12/02/2025 Site Engineering Standard REQUIRES RESUBMIT Permit: TD-DEV-1125-00278
Location: 1660 E TUCSON MARKETPLACE BL
Review Date: 12/2/2025

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf

Site Engineering Comments:
1. Provide the development package case number, TD-DEV-1125-00278, adjacent to the title block on all sheets.
2. Provide the page number and total number of pages within the DP (i.e., sheet xx of xx) AD 2-06.4.2. D
3. Provide the general note “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” Administrative Manual 2-06.4.7.B.1
4. Provide the general note “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” AM 2-06.4.7.B.3
5. Provide the general note “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” AM 2-06.4.7.C.2
6. If a trail or path is proposed, provide a general note, as appropriate, indicating that a trail or path will be constructed for public or private use, the general location of the trail or path, and whom it will be constructed and maintained by. If it is intended to connect to an offsite feature, such as an exiting trail, wash, sidewalk, road, commercial or residential development, etc., so indicate. If the trail or path is to be dedicated, indicate the method of dedication. AM 2-06.4.8.F.1
7. If a new trail or path will be constructed, add the following note, as appropriate: “All new onsite and offsite trails or paths constructed in conjunction with this project will be constructed in accordance with approved plans. Construction plans will be subject to the review and approval of the city’s Parks and Recreation Department, and, if requested, Pima County Natural Resources, Parks and Recreation.” AM 2-06.4.8.F.2
8. Show the 2-foot minimum grading setback from the property lines on the grading plan TSM 2-01.9.0
9. Keynote #24 on sheet 9 calls for a retaining wall – if this falls in the actual classification of a retaining wall, it will require that a separate structural wall permit with structural calculations/drawings be submitted for construction of the wall.
10. In accordance with general note #4 of the “Final Block Plat for the Bridges Blocks 1-15,” a floodplain use permit will be required to be submitted for both the development package and associated building permit. The floodplain use permit will be treated a “Final Plat” FPU permit. The FPU permit is a separate permit that can be submitted for within the sub-records of the development package on TDC online. For submission of the FPU permit just provide the development package/site plan document.
11. It is assumed that the fuel center will continue to operate as a one-way pull through center, will the new exit to the north-west be labeled similarly as existing? – “DO NOT ENTER / STOP” If so, show this on the site plan.
11/25/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added: TEP, TAA, ADOT, ENT, SWG, USPS, and PAG to the workflow. Review request email sent to TEP, TAA, ADOT, and FYI email sent to, SWG USPS PAG.
11/25/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
11/25/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
11/25/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
11/25/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
11/29/2025 ROW Review REVIEW COMPLETED