Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1125-00278
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/05/2025 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 11/05/2025 | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | NPPO Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | ROW Engineering Review Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | ROW Review | PENDING ASSIGNMENT | |||
| 11/05/2025 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | Site Landscape Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 11/05/2025 | OK to Submit - Engineering Fast | REQUIRES RESUBMIT | Permit: TD-DEV-1125-00278 Location: 1660 E TUCSON MARKETPLACE BL Review Date: 11/5/2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Comments: 1. Application incomplete. The total acre of disturbance is shown as 50,930 SF which equates to ~1.17 acres, therefore a Storm Water Pollution Prevention Plan (SWPPP) will be required for this development package submission. 2. Sheet 6 references a Geotech/Soils report, please provide said report within the resubmission of the development package. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 11/05/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED |