Permit Number: TD-DEV-1124-00315
Parcel: 12901011A

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.2

Permit Number - TD-DEV-1124-00315
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/26/2026 Design Review APPROVED A recorded Shared Parking & Cross Access Easement Agreement to allow access from/to parking lot under TD-DEV-1124-00316 for parking and refuse collection must be approved by Zoning prior to issuance of a Certificate of Occupancy for TC-COM-0325-00503 and TC-COM-0325-00504.
03/27/2026 NPPO APPROVED
03/18/2026 Site Engineering APPROVED
03/27/2026 Site Landscape REQUIRES RESUBMIT PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW FOOD SERVICE & COMMERCIAL RECREATION
ACTIVITY NO: TD-DEV-1124-00315
ADDRESS: 2330 E BROADWAY BL
ZONING: C-1 COMMERCIAL ZONE; UOD 3 SUNSHINE MILE (MID CENTURY SUBDISTRICT)
03.27.2026

THE PROPOSED PLANS HAVE BEEN REVIEWED FOR COMPLIANCE WITH APPLICABLE DEVELOPMENT STANDARDS FOR SITE LANDSCAPE, NATIVE PLANTS, AND RAINWATER HARVESTING, PER-THE-CITY OF TUCSON UNIFIED DEVELOPMENT CODE (UDC), TECHNICAL STANDARDS MANUAL (TSM), AND ADMINISTRATIVE MANUAL (AM).

RESUBMIT REVISED DRAWINGS ALONG WITH A DETAILED RESPONSE LETTER, STATING HOW ALL SITE LANDSCAPE AND NPPO SECTION REVIEW COMMENTS HAVE BEEN ADDRESSED.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. WHIA 1 A and B indicate a depth of 6 inches on your water budget table, but the top contour for the WHIA is missing. Remove the 6-inch depth from the water harvesting table if it is not intended to be depressed. **We would like to see as much landscape area depressed for rainwater as possible, even if not counting toward the CRWH Ordinance.

2. Label the SVTs as well as the existing and future ROW lines on all plans in the set, especially the planting plan. It appears that all of the proposed plants are on site, so no coordination with DTM and David Marhefka is needed.

Thank you.
Chad Keller, PLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
03/27/2026 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Loran Shamis
PDSD Zoning Review Section

PROJECT: Stravenue Social
Development Package (2nd Review)
TD-DEV-1124-00315 (2330 E BROADWAY BL)

TRANSMITTAL DATE: March 27, 2026
DUE DATE: March 27, 2026

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is March 13, 2027.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

1. COMMENT: 2-06.4.9.H.5.a – Parking is located on a parcel separated by public right-of-way; therefore, a separate development package is required. Refer to review for TD-DEV-1124-00316. Zoning cannot approve this development package until TD-DEV-1124-00316 has been approved.

2. COMMENT: 2-06.4.9.H.5.b - Per UDC 7.4.6.B.1.d, and SMD III.H.1.a.2.c, A recorded Shared Parking Agreement for the parking to be located off-site must be provided prior to issuance of the associated building per SMD III.H.3.b. A condition shall be placed on building permits TC-COM-0325-00503 and TC-COM-0325-00504 to provide this information prior to final Certificate of Occupancy.

3. COMMENT: 2-06.4.9.T – The refuse collection area is located on a parcel separated by public right-of-way; therefore, a separate development package is required. Refer to review for TD-DEV-1124-00316. Zoning cannot approve this development package until TD-DEV-1124-00316 has been approved.
4. COMMENT: Please include the following statement within General Note #18, near the Parking Calculation, the Long Term Bicycle Parking calculation and the Waste Stream calculation, that these required improvements are located off-site on APN 129-01-024J, reference TD-DEV-1124-00316.

***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact Loran Shamis by email Loran.Shamis@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package and comment response letter. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home.
Instructions for resubmittal - https://www.tucsonaz.gov/files/pdsd/website/Resubmittals.pdf.
03/26/2026 Commercial Plumbing REVIEW COMPLETED
03/27/2026 Fire New Construction REVIEW COMPLETED
03/25/2026 Historic REVIEW COMPLETED
03/24/2026 ROW Engineering Review REVIEW COMPLETED Broadway Blvd is under pavement moratorium until 08/15/2027. Pavement cuts will need to comply with Public Utility Administrative Manual.