Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1124-00303
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/09/2024 | Commercial Plumbing | APPROVED | |||
12/09/2024 | External Reviewers - COT Environmental Services | APPROVED | |||
12/13/2024 | NPPO | NOT REQUIRED | |||
11/26/2024 | Real Estate | NOT REQUIRED | PLease notify the Real Estate Division if any property rights need to be addressed. | ||
12/12/2024 | Zoning Modifications - Variance | NOT REQUIRED | |||
12/16/2024 | CDRC Post Review | PENDING ASSIGNMENT | |||
11/26/2024 | Design Review | REQUIRES RESUBMIT | RNA Design Package under SD-1124-00112 will need to be accepted and approved before the Development Package can be approved. Any questions, please let us both know: Gabriel Sleighter (gabriel.sleighter@tucsonaz.gov) and maria.gayosso@tucsonaz.gov. Thank you. | ||
12/13/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: MINOR DEVELOPMENT - TENANT IMPROVEMENT FOR AN OUTDOOR SEATING AREA ACTIVITY NO.: TD-DEV-1124-00303 PRE-APPLICATION NO.: TP-PRE-0824-00200 ADDRESS: 177 N CHURCH AV ZONING: OCR-2 COMMERCIAL ZONE; RIO NUEVO AREA This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to ensure compliance with the applicable UDC development criteria and Technical Standards. SITE LANDSCAPE/NPPO REVIEW COMMENTS: 1. Provide planting details for contractor construction purposes. Tree planting; shrub planting; cacti planting detail. 2. Backflow and battery powered controller are shown on the planting plant. It appears that irrigation drip lines are currently running to all of the planters as well. Provide a basic irrigation plan and details for construction purposes. IE: Single and multi-outlet emitter and poly pipe for shrubs and trees; end flush cap; trenching and pipe depth; rain shut off device if applicable. 3. City of Tucson Standard planting and irrigation details can be found here for your reference and use: https://www.tucsonaz.gov/Departments/Transportation-Mobility/Landscape/Landscape-Architects. 4. Add basic contouring and notes to depress the planting areas 2 to 4 inches to provide rainfall only water harvesting for the new proposed shrubs and trees. Depth not to exceed 4-inch for pedestrian health and safety. 5. A depressed landscape planting area schematic detail is not a requirement but adding it to the planting plan would be a nice addition for construction clarity. If you would like to add the detail and need an example, please reach out and I will send an example of the schematic for reference. 6. Can a couple more shade trees be added to the planter areas? Shading of the pedestrian circulation area is a large component of the landscape requirements within the Rio Nuevo Area. Specifically in the western most planter with the existing sign that does not currently include a shade tree. 7. Include a construction detail showing root barriers for trees located near hardscape areas. See Detail 402 located here: https://www.tucsonaz.gov/Departments/Transportation-Mobility/Landscape/Landscape-Architects 8. Add any general calculations per the Rio Nuevo Area Guidelines that are applicable to meeting the requirements of the area. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov or at 520.837.4923 |
||
12/16/2024 | Site Zoning | REQUIRES RESUBMIT | See comments provided by Nick Martell for Site Zoning in the "OK to Submit" stage. Approval of the Special Districts Application and IPP will be necessary before the development package can receive final approval from Site Zoning. | ||
12/12/2024 | Zoning Modifications - IPP | REQUIRES RESUBMIT | The IPP application has been accepted for processing. Please allow 6 weeks for this process. If the application is approved, please include with your required comment response letter a copy of the decision letter. If you have questions, please email Mark.Castro@tucsonaz.gov | ||
11/07/2024 | CDRC Application Completeness | REVIEW COMPLETED | |||
11/18/2024 | CDRC Review Coordinator | REVIEW COMPLETED | CDRC added ADOT PAG, USPS, SWG to the workflow. Review request email sent to ADOT. FYI email sent to PAG, USPS, SWG. | ||
11/19/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. -- Respectfully, James Gomes, Jr., PE SOUTHERN REGION TRAFFIC ENGINEERING MANAGER ARIZONA DEPARTMENT OF TRANSPORTATION 1221 S. 2nd Ave. Tucson, Az, 85713 520.388.4231 azdot.gov [azdot.gov] |
||
11/18/2024 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
11/18/2024 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
11/18/2024 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required. | ||
12/06/2024 | Fire New Construction | REVIEW COMPLETED | |||
12/10/2024 | Historic | REVIEW COMPLETED | This is RNA project. If using IID, PRS review will be required. If you have any questions, contact Michael Taku at Michael.Taku@tucsonaz.gov . |
||
11/26/2024 | MITZ District | REVIEW COMPLETED | |||
11/18/2024 | OK to Submit - Engineering | REVIEW COMPLETED | |||
11/08/2024 | OK to Submit - Zoning | REVIEW COMPLETED | CDRC Transmittal TO: Development Services Department FROM: Nicholas Martell, Principal Planner PROJECT: TD-DEV-1124-00303 Development Package (1st Review) TRANSMITTAL DATE: November 8, 2024 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 13, 2025 1. Provide a legend that shows and describes all symbols used on the drawing is to be provided, preferably on the first sheet. CONTENT REQUIREMENTS 2. Add the DP number (TD-DEV-1124-00303) to the title block 3. Ensure the page numbering is consistent. Sheet 1 shows 1 of 1 sheet. Ensure both sheets are accounted for. GENERAL NOTES 4. Provide, as a general note, “Existing zoning is ____.” 5. List the gross area of the site by square footage and acreage. 6. Identify the existing and proposed use of the property as classified per the UDC. 7. Provide a Percentage of gross floor area, land area, or vehicular use area expansion. If the building(s) or lot area have been previously expanded, those calculations shall be included. EXISTING SITE CONDITIONS: 8. Provide site boundary information, including bearing in degrees, minutes, and seconds, together with distances in feet, to hundredths of a foot, or other functional reference system. 9. Ensure all existing easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. 10. The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks. Please provide ROW information for Church and Alameda. INFORMATION OF PROPOSED DEVELOPMENT: The following information on the proposed project shall be shown on the drawing or added as notes. 11. All existing zoning classifications on and adjacent to the project (including across any adjacent right-of-way) shall be indicated on the drawing with zoning boundaries clearly defined. 12. As the use appears to be a Commercial-Food Service use, 15 additional parking spaces are required, per on UDC 7.4.4-1. Please provide a parking calculation for the building, including the new parking required from the construction of the patio. There are no parking spaces provided on the plan. The site is within the Greater Infill Incentive District, which may be used to reduce the parking by 25% (UDC 5.12.9). If a greater parking reduction is proposed, an Individual Parking Plan (IPP) may be applied for to reduce the parking. Please contact Mark.Castro@tucsonaz.gov for more information regarding the IPP. 13. As this site is located within the Downtown Zone RNA a Historic review must be completed prior to approval of this DP. 14. Show bicycle parking facilities fully dimensioned. For specifics, refer to Section 7.4.9, Bicycle Parking Design Criteria, of the UDC. Provide, as a note, calculations for short and long term bicycle spaces required and provided. 15. Show all loading zones, vehicle maneuverability fully dimensioned, and access route. Provide as a note the number of loading spaces required, the number provided, whether the loading space is a Type A or B as provided in UDC Section 7.5.4. 16. Provide all applicable building setback lines per UDC 6.4.5. 17. Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual. Ensure the proposed patio does not obstruct any require pedestrian access. 18. Show existing or proposed pedestrian circulation along abutting rights-of-way. Such sidewalks must comply with accessibility requirements for the physically disabled and the design criteria in Section 10-01.0.0, Street Technical Standards, of the Technical Standards Manual. 19. Show refuse collection areas, including locations of dumpsters, screening location and materials, and vehicle maneuverability, fully dimensioned, and access route. If dumpster service is not proposed, indicate type of service. For specific information on refuse collection, refer to Section 8-01.0.0, Solid Waste and Recycle Disposal, Collection, and Storage, of the Technical Standards Manual. Refuse collection on all projects shall be designed based on that section, even if collection is to be contracted to a private firm. Please note that this is a full review from zoning. This review was completed during the OK to Submit stage of the DP for the purposes of initializing the IPP to avoid delays. For any questions regarding this transmittal, please contact me at Nicholas.Martell@tucsonaz.gov |
||
11/19/2024 | ROW Engineering Review | REVIEW COMPLETED | Proposed work does not have effect on DTM right of way access | ||
12/10/2024 | Site Engineering | REVIEW COMPLETED |