Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-1124-00301
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/05/2025 | ROW Engineering Review | APPROVED | |||
| 02/21/2025 | Site Landscape | APPROVED | |||
| 03/18/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 02/03/2025 | Site Engineering | REQUIRES RESUBMIT | 1. Previous comment 2 not address. The trash enclosure detail is still showing less than 2% slopes on the concrete ramp, please revise as needed. 2. The grading sheet shows a sump pump being proposed. The use of a pump will be acceptable for this project on the condition that the Pump Standards are met from section 4.18 of the Design Standards for Stormwater Detention and Retention Manual. Please include a letter in the next submittal addressing each standard found in section 4.18 and how it is being met. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 02/12/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Trader Joe’s @ 2150 E BROADWAY BL Development Package (2nd Review) TD-DEV-1124-00301 TRANSMITTAL DATE: February 12, 2025 DUE DATE: February 11, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is November 19, 2025. 1. This comment was not fully addressed. The case number was not provided on sheets 8 – 14. COMMENT: 2-06.4.3 – Provide the development package case number, TD-DEV-1124-00301, adjacent to the title block on all sheets. 2-06.4.8 - Existing Site Conditions The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided. 2. This comment was not addressed. COMMENT: 2-06.4.8.B – As cross access is proposed with parcel 129-04-171A to the south some type of easement or agreement is required. Provide a copy of the recorded document with the next submittal. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 3. This comment was not addressed. COMMENT: 2-06.4.9.A – As this site appears to be made up of 5 parcels and some right-of-way a lot combination and abandonment of the right-of-way is required prior to approval of this DP. Provide the applicable documentation for these requirements. 4. Zoning acknowledges that this comment may have been confusing. As the proposed building is located within the C-1 zoned portion of the site the dimensional standards should refence C-1 zoning requirements and the allowed height should be 30’. COMMENT: 2-06.4.9.Q – General Note 17 you reference “DIMENSIONAL STANDARDS PER U.D.C SEC. 6.3 FOR C-2 ZONE, Maximum Building Height = 30’”. Per UDC Table 6.3-4.A C-2 zone the maximum allowed height is 40’. As the proposed building appears to be located within the C-1 zoned portion of the site the dimensional standards should refence C-1 zoning requirements. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 03/18/2025 | Transportation Landscape Review Standard | REQUIRES RESUBMIT | |||
| 02/26/2025 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Morning, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
| 03/10/2025 | External Reviewers - Tucson Electric Power (TEP) | REVIEW COMPLETED | March 10, 2025 WO#T134779 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: New Commercial Building for Food & Beverage TD-DEV-1124-00301 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 1/28/2025. There are existing facilities within the development which are depicted upon the plan. The existing facilities are to be relocated. Preliminary construction drawing was sent on existing WO #T124882. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Martin Salazar (520) 305-6713 msalazar@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 02/27/2025 | Historic Standard | REVIEW COMPLETED | The property is located in the Sunshine Mile Historic District, an Overlay District. The applicant is not using Sunshine Mile Overlay District tool for this development. The proposed properties to be demolished are contributors to the District and 50 years or older. As such, Ordinance No. 10776 applies. Per this Ordinance, architectural documentation prior to demolition of historic buildings (Article 5.3.11). Full Historic documentation of the building(s) will be submitted as part of demolition permit application. The historic documentation will be reviewed and approved by the Historic Preservation Officer (HPO). Attached is the link to the Demo Documentation form. https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/planning-amp-zoning/historic_demolition_application_form.pdf Note all photos must be in color and properly labelled to be considered. Contact Michael.Taku@tucsonaz.gov |