Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1123-00468
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/04/2023 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 12/04/2023 | CDRC Review Coordinator Express | PENDING ASSIGNMENT | |||
| 12/04/2023 | Commercial Plumbing | PENDING ASSIGNMENT | |||
| 12/04/2023 | Fire New Construction | PENDING ASSIGNMENT | |||
| 12/04/2023 | NPPO | PENDING ASSIGNMENT | |||
| 12/04/2023 | ROW Engineering Review | PENDING ASSIGNMENT | |||
| 12/04/2023 | Site Engineering | PENDING ASSIGNMENT | |||
| 12/04/2023 | Site Landscape | PENDING ASSIGNMENT | |||
| 12/04/2023 | Site Zoning | PENDING ASSIGNMENT | |||
| 11/29/2023 | OK to Submit - Zoning Fast | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 2120 E. Eastland St – R-2 – Residential Detached Structures TD-DEV-1123-00468 Development Package – OK to Submit (1st Review) TRANSMITTAL DATE: November 29, 2023 The development package has been reviewed by the Zoning Review Section for minimal compliance with Administrative Manual (AM) 2-06. It has been determined that the submitted plans reference old codes and need to be revised to reference the current code The following items need to be addressed prior to re-submittal. 2-06.2.0 APPLICATION SUBMITTAL REQUIREMENTS 1. The proposed addition of sheds to a residential site does not require a development package and shall be submitted as a Residential Addition permit. The plan shall meet the requirements for a residential plot plan found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Building-Safety/Plan-Examples/Plot-Plan-Example. This development plan will need to be withdrawn. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. |
||
| 11/28/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 12/04/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 11/29/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED |