Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.1
Permit Number - TD-DEV-1123-00467
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/08/2024 | Commercial Plumbing | APPROVED | |||
| 12/28/2023 | External Reviewers - Tucson Airport Authority | APPROVED | December 27, 2023 Planning and Development Services City of Tucson 201 North Stone Avenue Tucson, AZ. 85701 RE: TD-DEV-1123-00467, Stockpile Grading Plan / 7500 E Voyager Rd, Tucson, AZ 85756, Received December 6, 2023 To whom this may concern, Thank you for the opportunity to comment on TD-DEV-1123-00467, the development plan a stockpile grading plan for a future housing development at 7500 E Voyager Rd. This development is located in the N.E. quarter of the N.E. quarter of Section 32, Township 15S, Range 15E, of the Gila and Salt River Meridian. The development site occupies parcel number 141-25-005B, covers approximately 64.02 ± acres, and is presently zoned as Residence Zone X1 (RX-1) but was rezoned to Mobile Home Zone 2 (MH-2) as part of City of Tucson rezoning case C9-19-17. The nearest major roadway intersection is East Voyager Road and South Kolb Road, approximately 2,000 feet to the northwest of the subject development. This site does lie within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace. The Tucson Airport Authority approves the 1st submittal of this project, is not requiring a resubmit of this project and has no additional comments to provide. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, C.M. Manager of Planning |
||
| 01/04/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | January 4, 2024 WO#T99008 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: Stockpile Grading Plan TD-DEV-1123-00467 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 12/6/2023. There are no existing facilities within the development currently and thus no conflicts with TEP Facilities at this time; the same area is expected to be developed by Voyager Mobile Home Park in the future Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Gabriela Bielecka Tucson Electric Power Company New Business Residential Project Manager P. O. Box 711 (OH 204) Tucson, AZ 85703 (520) 651-3833 Should you have any technical questions, please contact the area designer, Cruz Vega at (520) 349-9850. Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 01/04/2024 | NPPO | APPROVED | |||
| 01/02/2024 | ROW Engineering Review | APPROVED | |||
| 01/04/2024 | Site Landscape | APPROVED | |||
| 01/03/2024 | Site Zoning | APPROVED | |||
| 12/11/2023 | Fire New Construction | NOT REQUIRED | |||
| 01/10/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 01/10/2024 | Site Engineering | REQUIRES RESUBMIT | Either provide a site specific SWPPP or notice that prior SWPPP for DP will remain in effect for duration of this stockpile. Joshua Garcia joshua.garcia@tucsonaz.gov |
||
| 11/29/2023 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 12/06/2023 | CDRC Review Coordinator Express | REVIEW COMPLETED | Review request email sent per ADOT,TAA and TEP. CDRC sent FYI email to PAG, USPS, SWG. | ||
| 01/03/2024 | External Reviewers - Arizona Department of Transportation (ADOT) | REVIEW COMPLETED | Good Afternoon, ADOT has no comments on this DEV. Thank you for the opportunity to review. |
||
| 12/06/2023 | External Reviewers - Pima Association of Governments | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 12/06/2023 | External Reviewers - Southwest Gas | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 12/06/2023 | External Reviewers - United States Postal Service (USPS) | REVIEW COMPLETED | CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time. | ||
| 12/05/2023 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 11/30/2023 | OK to Submit - Landscape Fast | REVIEW COMPLETED | |||
| 12/06/2023 | OK to Submit - Zoning Fast | REVIEW COMPLETED |