Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.4
Permit Number - TD-DEV-1123-00465
Review Name: DEVELOPMENT PACKAGE NEW v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/05/2024 | External Reviewers - Pima County Addressing | APPROVED | Good morning, Pima County Addressing approves TD-DEV-1123-00465. Nicholas Jordan Site Review Project Manager II – Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
||
| 08/21/2024 | External Reviewers - Tucson Electric Power (TEP) | APPROVED | August 19, 2024 WO#T108425 City of Tucson Planning and Development Services Attn: CDRC Admin Team Dear CDRC Admin Team Subject: 6 Unit Residential Development - Alumni Fort Lowell TD-DEV-1123-00465 Tucson Electric Power Company (TEP) has reviewed and approved the development plan submitted 6/21/2024. There are existing facilities within the development which are depicted upon the plan; there are no apparent conflicts at this time. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer. To apply for electric service, please call the New Construction department at (520) 918- 8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans. If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department, LandReviews@tep.com. Should you have any technical questions, please contact the area designer, Chuck Leon (520) 400-6133 cleon@tep.com Sincerely, Design Admins Design Admins Tucson Electric Power |
||
| 07/17/2024 | ROW Engineering Review | APPROVED | 1. Add a general note indicating that all utility connections and improvements within the public rights-of-way will require a separate permit. Add a general note indicating that all utility connections and improvements within the public rights-of-way will require a separate permit. If you have any questions, please contact Richard Leigh at arnold.leigh@tucsonaz.gov, 520-403-0970 |
||
| 08/21/2024 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 07/29/2024 | Site Engineering | REQUIRES RESUBMIT | 1. A floodplain use permit is required before the development package can be approved. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
| 07/30/2024 | Site Landscape | REQUIRES RESUBMIT | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: 4 UNIT RESIDENTIAL DEVELOPMENT (MULTI-FAMILY) ACTIVITY NO: TP-DEV-1123-00465 ADDRESS/PARCEL: 1125 E FORT LOWELL RD/ 11304345A ZONING: R-2 RESIDENTIAL ZONE (MULTI-FAMILY DEVELOPMENT) This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed. SITE LANDSCAPE/NPPO COMMENTS: 1. The shade trees in the parking area islands appear to be very close to the underground water lines. If possible, adjust the tree locations so that the root structures don’t have an opportunity to disturb the water lines. This is just a precaution. Maybe add a callout to the trees for the contractor to be aware of the underground utilities. 2. Note number 5 on the landscape plan does call out the civil plans for the basins. Add a general note to the CRWHP that refers to the civil plans for construction of the basins as well. Possibly add typical leader callouts at a few of the basins to make sure the contractor references the civil plans for basin details and construction. All other previous landscape/nppo comments have been satisfied. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
||
| 07/19/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Development Package (2nd Review) TD-DEV-1123-00465 TRANSMITTAL DATE: July 19, 2024 DUE DATE: July 22, 2024 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is March 11, 2025. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. This comment was not addressed correctly. Per UDC Article 6.3.3.D Multifamily development is consider to be a nonresidential use. Therefore per UDC Table 6.3-3A the allowed height is 40’ in the O-3 zone. COMMENT: 2-06.4.9.Q – The allowed height listed under General Note 7 is not correct review UDC Tables 6.3-2.A & 6.3-3.A and provide the correct allowed heights for both zones. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 06/21/2024 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 07/22/2024 | Historic | REVIEW COMPLETED |