Permit Number: TD-DEV-1123-00458
Parcel: 11616287B

Address:
845 N MAIN AV

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-1123-00458
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/19/2023 Commercial Plumbing APPROVED
12/28/2023 NPPO APPROVED
12/19/2023 ROW Engineering Review APPROVED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
12/27/2023 Site Engineering APPROVED
12/28/2023 CDRC Post Review PENDING ASSIGNMENT
12/28/2023 Site Landscape REQUIRES RESUBMIT ACTIVITY NO. TD-DEV-1123-00458
PROJECT: FOOD BANK – CARIDAD KITCHEN EXPANSION
ADDRESS/PARCEL: 845 N MAIN AV/116-16-287B
ZONING: C-3

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

COMMENTS:
1. Ensure all Zoning and Engineering comments are addressed prior to the Landscape/NPPO comments.
2. Please include the correct Development Package number, TD-DEV- TD-DEV-1123-00458 on all landscape & NPPO sheets.  
3. Ensure the Grading Plan matches the Commercial Rainwater Harvesting Plan & the Landscape Plan.
4. If using d.g at a 2” depth, ensure the rainwater harvesting basins are 8” in depth to account for the d.g. Then revise the Site Water Budget table to reflect these changes.
If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
12/13/2023 Site Zoning REQUIRES RESUBMIT CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: 845 N MAIN AV
Development Package (1st Review)
TD-DEV-1123-00458
Parking expansion

TRANSMITTAL DATE: December 13, 2023



COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is November 20, 2023.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)




2-06.4.3 - The administrative street address and relevant case numbers (development package document, subdivision, rezoning, board of adjustment, DDO, MDR, DSMR, overlay, etc.) shall be provided adjacent to the title block on each sheet.

1. COMMENT: 2-06.4.3 - Provide the development package case number, TD-DEV-1123-00458, adjacent to the title block on each sheet.



2-06.4.7.A.4 - Identify the existing and proposed use of the property as classified per the UDC. List all UDC sections applicable to the proposed uses.

2. COMMENT: 2-06.4.7.A.4 - add the following to subject to accessory uses permitted “Perishable Goods Manufacturing (limited to baked goods and confectionary products) subject to use specific standard “4.9.5.C.9”


***For additional information on the any standard presented in this memo, please refer to the City of Tucson “Unified Development Code” – Administrative Manual Section 2-06 or Technical Standards noted in the comments. https://www.tucsonaz.gov/pdsd/all-codes-plans-determinations


If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov
RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/21/2023 CDRC Application Completeness REVIEW COMPLETED
11/28/2023 CDRC Review Coordinator REVIEW COMPLETED Review request email sent per ADOT, TEP. CDRC sent FYI email to PAG, USPS, SWG.
12/14/2023 External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED Good Afternoon,
ADOT has no comments on this DEV.
Thank you for the opportunity to review.
11/28/2023 External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time.
11/28/2023 External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time.
12/01/2023 External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED Greetings,
Tucson Electric Power Co. (TEP) has reviewed and has no objection to the plans submitted on November 28th, 2023. Costs for removing or relocating existing TEP facilities will be billable to the developer. There are existing TEP facilities within the boundaries of the plat. Charges for removing or relocating existing TEP facilities will be billable to the developer.
Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument.
If there are any questions, don't hesitate to contact Land Resources at tepdevrev@tep.com.
Respectfully,
Tucson Electric Power Co.
Land Resources Department
11/28/2023 External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email to PAG, USPS and SWG. No further action is required from customer at this time.
12/11/2023 Fire New Construction REVIEW COMPLETED
11/27/2023 OK to Submit - Engineering REVIEW COMPLETED
11/22/2023 OK to Submit - Landscape REVIEW COMPLETED
11/24/2023 OK to Submit - Zoning REVIEW COMPLETED