Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW v.2
Permit Number - TD-DEV-1123-00457
Review Name: DEVELOPMENT PACKAGE NEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/07/2023 | ROW Engineering Review | APPROVED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
||
12/14/2023 | Site Engineering | APPROVED | |||
12/11/2023 | Site Landscape | APPROVED | |||
12/07/2023 | Site Zoning | APPROVED | |||
12/22/2023 | CDRC Post Review | PENDING ASSIGNMENT | |||
12/22/2023 | Floodplain Administration Review | REQUIRES RESUBMIT | 1) The Citation W.A.S.H. is currently being used for temporary PFAS effluent discharges and requires special maintenance activities. It is recommended that there be no diversion of this effluent onto the park play areas until the permanent solution for PFAS treatment plant is established so that the effluent is not flowing in Citation W.A.S.H. 2) The maintenance states on the plans that this project is to be City maintained. However during the PFAS treatment discharge project, the Citation WASH is being maintained by the State. The frequency of the maintenance activities is sporadic and needed more frequently so that there is no increase to flood conditions along the wash due to change in the ecology from the continual discharge. Maintenance activities for the Citation W.A.A.S.H. therefore, at this time, require fast turn-around time, in order to stop the PFAS treatment and resume it after the watercourse maintenance activities are completed. Algae mat removal and grass mowing is required along with other activities. Therefore any improvements that impede mowing or other activities (such as proposed diversion structures and spillways) should not be constructed until after the completion of the PFAS treatment project or diversion of effluent to other drainage system. |
||
12/06/2023 | CDRC Application Completeness | REVIEW COMPLETED |