Permit Number: TD-DEV-1122-00057
Parcel: 14118008L

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-1122-00057
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/21/2023 NPPO APPROVED
11/16/2023 ROW Engineering Review APPROVED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
11/22/2023 Site Engineering APPROVED
11/21/2023 Site Landscape APPROVED
11/22/2023 CDRC Post Review PENDING ASSIGNMENT
11/16/2023 Commercial Plumbing REQUIRES RESUBMIT Drawings C-104, C-105, and C-202 show an FFE of 3006.39 but drawings SMP-3, SMP-4, and SMP-5 show an FFE of 3005.98. Verify the FFE.
11/03/2023 Site Zoning REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Home Depot @ Houghton Town Center
Development Package (1st Review – 1st Revision)
TD-DEV-1122-00057

TRANSMITTAL DATE: November 3, 2023

DUE DATE: November 25, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One-year Expiration date is February 13, 2024.

2-06.4.7.A.8 - For development package documents provide:

1. COMMENT: 2-06.4.7.A.8.a – The square footage shown within the footprint of the building on sheet 3 does not add up to what is shown within the table or the total square footage shown under Development Package Calculations #1.

2-06.4.9 - Information on Proposed Development
The following information on the proposed project shall be shown on the drawing or added as notes.

2. COMMENT: 2-06.4.9.H.5.a – The building square footage listed under Development Package Calculations #3 does not match what is shown under Development Package Calculations #1 or the table on sheet 3.

3. COMMENT: 2-06.4.9.H.5.d – The required number of long term bicycle parking spaces shown under Development Package Calculations #4 is not correct. Using the 136,631 SF number provided in the calculation 136,631/12,000 = 11.39 or 11 required, UDC Article 7.4.3.G.

4. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
10/19/2023 CDRC Application Completeness REVIEW COMPLETED
10/30/2023 CDRC Review Coordinator REVIEW COMPLETED External Reviewers not required.
11/07/2023 Fire New Construction REVIEW COMPLETED
10/23/2023 OK to Submit - Engineering REVIEW COMPLETED
10/23/2023 OK to Submit - Landscape REVIEW COMPLETED
10/25/2023 OK to Submit - Zoning REVIEW COMPLETED