Permit Number: TD-DEV-1122-00048
Parcel: 12511163D

Address:
3861 E 3RD ST

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - TD-DEV-1122-00048
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/12/2022 OK to Submit - Zoning Fast APPLICATION INCOMPLETE 1. Include the related case numbers to each sheet of the development package - IPP application T22SA00435 and and rezoning case C9-22-09.
2. Include a sheet index and provide sheet numbers to each sheet in the following format (Sheet X of Y).
3. Include the parking area access lane (PAAL) and sidewalk/pedestrian circulation width dimensions.
4. Provide pedestrian circulation to the trash enclosure (TSM 7-01)

Loran Shamis
Loran.Shamis@tucsonaz.gov
01/03/2023 CDRC Post Review Express PENDING ASSIGNMENT
01/03/2023 CDRC Review Coordinator Express PENDING ASSIGNMENT
01/03/2023 Commercial Plumbing PENDING ASSIGNMENT
01/03/2023 Fire New Construction PENDING ASSIGNMENT
01/03/2023 NPPO PENDING ASSIGNMENT
01/03/2023 ROW Engineering Review PENDING ASSIGNMENT
01/03/2023 Site Engineering PENDING ASSIGNMENT
01/03/2023 Site Landscape PENDING ASSIGNMENT
01/03/2023 Site Zoning PENDING ASSIGNMENT
12/09/2022 OK to Submit - Engineering Fast REQUIRES RESUBMIT 1. This looks to be a preliminary development plan for the rezoning, please submit a full development package for review including a drainage report and grading cut/fill quantities.
Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
12/05/2022 CDRC Application Completeness Express REVIEW COMPLETED
01/03/2023 OK to Submit - External Reviewer PC Addressing Fast REVIEW COMPLETED Good afternoon,



This project does require review. We will invoice the project once a complete plan set is submitted.





Thank you



Nicholas Jordan

Site Review Project Manager - Addressing Official

Pima County Development Services Department

201 N Stone AV – 1st Floor

Tucson, AZ 85701

(520) 724-9623